πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Grid infrastructure β€Ί Connection queue β€Ί Onshore wind

ONSHORE WIND Β· SPT

Windy Standard 1 Repower

Windy Standard 1 Repower is a 22 MW onshore wind project in planning, connecting to the SP Transmission (south Scotland) network at Dun Hill 132/33kV, with capacity due from June 2031. The connection agreement is held by Fred Olsen Renewables Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Jun 2031 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-006071
Customer
Fred Olsen Renewables Limited
Technology
Wind Onshore
Total capacity
22 MW
Change in this agreement
+22 MW
Capacity effective from
30 June 2031
Connection site
Dun Hill 132/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Dun Hill Β· Grid map

Other projects at Dun Hill 132/33kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem