Grid infrastructure βΊ Connection queue βΊ Onshore wind
ONSHORE WIND Β· SPTWindy Standard III Wind Farm
Windy Standard III Wind Farm is a 88 MW onshore wind project consented, connecting to the SP Transmission (south Scotland) network at Dun Hill 132/33kV, with capacity due from October 2027. The connection agreement is held by Windy Standard III Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Oct 2027 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-000359-2
- Customer
- Windy Standard III Limited
- Technology
- Wind Onshore
- Total capacity
- 88 MW
- Change in this agreement
- +44 MW
- Capacity effective from
- 31 October 2027
- Connection site
- Dun Hill 132/33kV
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Consents Approved
- Connections reform gate
- Gate 2
Connection site
The connection site could not be placed on the map.
Other projects at Dun Hill 132/33kV
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem