NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown1,590616.3 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

1,590 projects · page 29 of 32
ProjectCapacityStageConnection siteFrom
Allt an Tuir Renewable Energy Park
Solar + storage · Allt An Tuir Renewable Energy Park Limited
50 MWScoping Shin 1 GSP
SSEN Transmission (north Scotland)
Jun 2031
Aultcraggie BESS
Battery storage · Opde UK Limited
50 MWScoping Brora GSP
SSEN Transmission (north Scotland)
Oct 2034
Bicker Fen 2 Solar
Solar + storage · Agr Solar 3 Limited
50 MWAwaiting Consents Bicker Fen 400kV Substation
National Grid (England & Wales)
Jul 2026
Blackbraes PV+BESS
Solar + storage · Chint Solar UK Management Ltd
50 MWScoping Blackbraes IDNO GSP
SP Transmission (south Scotland)
Oct 2031
Breakish Windfarm
Onshore wind · Asuk Holdco 2 Limited
50 MWScoping Breakish 132kV Substation
SSEN Transmission (north Scotland)
May 2029
Cloud Hill Windfarm
Wind + storage · Cloud Hill Windfarm Limited
50 MWAwaiting Consents Glenglass 132/33kV
SP Transmission (south Scotland)
May 2030
Coldstream BESS
Battery storage · Igp Energy Storage 4 Limited
50 MWScoping Eccles 400/132kV
SP Transmission (south Scotland)
Oct 2030
Cornharrow Wind Farm
Onshore wind · Energyfarm UK Cornharrow LLP
50 MWScoping Quantans Hill 132kV Substation
SP Transmission (south Scotland)
Oct 2030
Elvanfoot (50MW) Energy Storage
Battery storage · Elvanfoot Energy Storage 2 Limited
50 MWScoping Elvanfoot Energy Storage 132/33Kv Collector Substation
SP Transmission (south Scotland)
Oct 2029
ER BBR Energy
Solar + storage · Er Project Development Co Limited
50 MWScoping Er Bbr Energy 132kV Substation
SP Transmission (south Scotland)
Oct 2029
Fell Wind Farm
Onshore wind · Energyfarm UK Fell LLP
50 MWScoping SPT Margree collector substation
SP Transmission (south Scotland)
Oct 2029
Garlogie B-1
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production B 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Garlogie B-2
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production B 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Garlogie C-1
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production C 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Garlogie C-2
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production C 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Garlogie PV and BESS A-1
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production A 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Garlogie PV and BESS A-2
Solar + storage · Garlogie Energy Centre Limited
50 MWScoping Garlogie Production A 275/33kV GSP
SSEN Transmission (north Scotland)
Oct 2033
Jamesfield 3
Battery storage · Harmony Energy Limited
50 MWScoping New Abernethy 132kV
SSEN Transmission (north Scotland)
Oct 2037
Learney BESS
Battery storage · Igp Solar 22 Limited
50 MWScoping Learney BESS 132Kv
SSEN Transmission (north Scotland)
Oct 2032
Locharber
Solar + storage · Lochaber Energy Centre Limited
50 MWScoping Arbroath GSP
SSEN Transmission (north Scotland)
Oct 2032
Margree Wind Farm
Onshore wind · Energyfarm UK Margree LLP
50 MWAwaiting Consents SPT Margree collector substation
SP Transmission (south Scotland)
Oct 2029
Mosspark Energy Park
Solar + storage · REG Power Developments Limited
50 MWScoping Dumfries 132/33kV
SP Transmission (south Scotland)
May 2029
Nether Pitforthie BESS
Battery storage · Opdenergy UK 14 Limited
50 MWScoping Fiddes 275/33Kv Grid Supply Point Substation
SSEN Transmission (north Scotland)
Oct 2032
Newton of Park BESS 2
Battery storage · Opdenergy UK 16 Limited
50 MWScoping Nairn 132/33kV Grid Supply Point Substation
SSEN Transmission (north Scotland)
Jan 2028
Project Flora Peterhead
Offshore wind · Jera Nex Bp North East Limited
50 MWScoping Peterhead Grange GSP
SSEN Transmission (north Scotland)
Oct 2033
Rugeley
Battery storage · Rugeley Power Generation Limited
50 MWScoping Rugeley GSP
National Grid (England & Wales)
Oct 2032
Scottish Water Laigh Park STW
Battery storage · Bluestone Energy Ltd
50 MWScoping Braehead Park 132/33kV
SP Transmission (south Scotland)
Jun 2028
West Torrisdale
Onshore wind · Esb Asset Development UK Limited
50 MWScoping Carradale 2 132/33kV GSP Substation
SSEN Transmission (north Scotland)
May 2028
Yamal BESS
Battery storage · Opde UK Limited
50 MWScoping MacDuff 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2033
JBM Solar 12 - Shrewsbury Solar
Solar + storage · RWE Renewables UK Solar and Storage Limited
50 MWScoping Shrewsbury 400/33kV Substation
National Grid (England & Wales)
Sep 2028
Harrington Franklin Limited
Battery storage · Edp Renewables UK Limited
50 MWAwaiting Consents Richborough GSP
National Grid (England & Wales)
Oct 2025
Achanalt Battery Storage
Battery storage · Adtek Limited
50 MWScoping Grudie Bridge GSP
SSEN Transmission (north Scotland)
Oct 2027
Alverdiscott
Battery storage · Pivoted Power LLP
50 MWScoping Alverdiscott 400kV Substation
National Grid (England & Wales)
Aug 2031
AMP Eccles BESS
Battery storage · Eccles Grid Stability Limited
50 MWScoping Eccles 400/132kV
SP Transmission (south Scotland)
Oct 2029
Axminster
Battery storage · Pivoted Power LLP
50 MWScoping Axminster 400kV Substation
National Grid (England & Wales)
Oct 2027
Biggleswade PV
Solar + storage · Cse38 Limited
50 MWAwaiting Consents Biggleswade 400kV Substation
National Grid (England & Wales)
Oct 2031
Bolney BESS
Battery storage · Cse45 Limited
50 MWScoping DRAGON GREEN 400kV SUBSTATION
National Grid (England & Wales)
Sep 2037
Carseview Road BESS
Battery storage · Vital Energi Solutions Limited
50 MWScoping Lunanhead 2 GSP
SSEN Transmission (north Scotland)
Oct 2032
Chirton Grange
Solar + storage · Elawan Energy UK Limited
50 MWScoping Tynemouth GSP (NPG)
National Grid (England & Wales)
Oct 2035
Coupar Solar Farm
Solar · Coupar Two Limited
50 MWScoping Coupar Angus 132/33kV GSP
SSEN Transmission (north Scotland)
Apr 2027
Craigend
Solar · Renewable Energy Systems Limited
50 MWScoping Arbroath GSP
SSEN Transmission (north Scotland)
Jun 2032
Crookedstone PV
Solar · Enviromena Project Management UK Limited
50 MWScoping Strathaven GSP 33kV
SP Transmission (south Scotland)
Oct 2032
Drumlithie Battery Storage
Battery storage · Drumlithie Battery Limited
50 MWScoping Fetteresso GSP
SSEN Transmission (north Scotland)
Oct 2028
Drumore Farm
Battery storage · Drumore Battery Storage Limited
50 MWScoping Alness 2 275/33 kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2030
Dunmill Energy Storage
Battery storage · Dunmill Energy Storage Limited
50 MWScoping Bridge of Dun GSP
SSEN Transmission (north Scotland)
Jun 2032
Eaton Socon PV Storage
Solar + storage · CSE37 Limited
50 MWScoping Eaton Socon 400kV Substation
National Grid (England & Wales)
Oct 2029
EMERGE Centre
Other · Uniper UK Limited
50 MWScoping Ratcliffe-On-Soar 132kV Substation
National Grid (England & Wales)
Jun 2029
Exeter (Tertiary)
Solar + storage · Pivoted Power LLP
50 MWAwaiting Consents Exeter 400kV Substation
National Grid (England & Wales)
Jun 2028
Fauldielaw
Solar · Cairn Duhie Energy Limited
50 MWScoping Arbroath 2 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2032
Fife 2 BESS
Battery storage · Carlton Power Limited
50 MWScoping Westfield 132/33kV
SP Transmission (south Scotland)
Jun 2028
Page 29 of 32

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.