Grid infrastructure βΊ Connection queue βΊ Other
OTHER Β· NGETEMERGE Centre
EMERGE Centre is a 50 MW other project in planning, connecting to the National Grid (England & Wales) network at Ratcliffe-On-Soar 132kV Substation, with capacity due from June 2029. The connection agreement is held by Uniper UK Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jun 2029 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001462
- Customer
- Uniper UK Limited
- Technology
- Waste
- Total capacity
- 50 MW
- Change in this agreement
- +50 MW
- Capacity effective from
- 29 June 2029
- Connection site
- Ratcliffe-On-Soar 132kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.