Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown2,255782.1 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

2,255 projects · page 22 of 46
ProjectCapacityStageConnection siteFrom
Blairgowrie BESS
Battery storage · Woodside BESS Ltd
200 MWScoping Blairgowrie BESS 132kV Substation
SSEN Transmission (north Scotland)
May 2030
Blanket’s Farm
Battery storage · Noventum Power Solar 9 Limited
200 MWScoping Warley 275kV Substation
National Grid (England & Wales)
Oct 2038
Bolney Farm
Solar + storage · Dragon Green 2 Renewables Ltd
200 MWScoping Bolney 400kV Substation
National Grid (England & Wales)
Oct 2037
Bramley Farm
Solar + storage · Bramley 2 Renewables Ltd
200 MWScoping Basingstoke East 400kV Substation
National Grid (England & Wales)
Mar 2038
Broadford BESS
Battery storage · Field Devco Ltd
200 MWScoping Broadford 132kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Bulls Lodge Farm
Solar + storage · 548 UK Investment Holdings Limited
200 MWScoping Braintree 400kV Substation
National Grid (England & Wales)
Apr 2033
Carberry BESS (was Smeaton BESS)
Battery storage · Harmony Cbr Ltd
200 MWScoping Dalkeith 400kV Substation
SP Transmission (south Scotland)
Jun 2031
Chickerell
Solar + storage · Enso Green Holdings X Limited
200 MWAwaiting Consents Chickerell 400kV Substation
National Grid (England & Wales)
Dec 2036
Cloiche Wind Farm
Onshore wind · Sse Generation Limited
200 MWScoping Cloiche 132/33kV Substation
SSEN Transmission (north Scotland)
Feb 2028
Clonmacate Farm BESS
Battery storage · GPC Project 11 Ltd
200 MWScoping Ayr 275/33kV
SP Transmission (south Scotland)
Oct 2030
Corriemoillie BESS
Battery storage · Field Corriemoillie Ltd
200 MWScoping Corriemoillie 132kV Substation
SSEN Transmission (north Scotland)
Sep 2029
Cowley Energy Storage
Battery storage · Bw Ess Development UK Limited
200 MWConsents Approved Cowley 400kV Substation
National Grid (England & Wales)
Jul 2028
Cowley Farm
Solar + storage · Cowley 2 Renewables Ltd
200 MWScoping Cowley 400kV Substation
National Grid (England & Wales)
Oct 2038
Dalchork Farm
Battery storage · Qair Renewables UK Limited
200 MWScoping Dalchork 132kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Derwent Solar 2
Solar · Derwent Solar 2 Limited
200 MWScoping Osbaldwick (North Humber Connection Node E) 132kv Substation
National Grid (England & Wales)
Oct 2039
Didcot Farm
Solar + storage · Appleford 2 Renewables Ltd
200 MWScoping APPLEFORD 400kV SUBSTATION
National Grid (England & Wales)
Oct 2037
Dounreay BESS
Battery storage · Field Devco Ltd
200 MWScoping New Dounreay 400kV substation
SSEN Transmission (north Scotland)
Oct 2034
Drakelow BESS
Battery storage · Harmony Dl Ltd
200 MWConsents Approved Drakelow 400kV Substation
National Grid (England & Wales)
Dec 2029
Eggborough BESS
Battery storage · Fig Power Limited
200 MWScoping Leeds North Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
Enderby Farm
Solar + storage · 548 UK Investment Holdings Limited
200 MWScoping Earl Shilton 400kV Substation
National Grid (England & Wales)
Oct 2034
ER MSM Energy
Solar + storage · Er Project Development Co Limited
200 MWScoping Er Msm Energy 132kV Substation
SP Transmission (south Scotland)
Oct 2030
Ferrybridge B - NEL Hunter
Battery storage · UE 4 LTD
200 MWScoping Leeds North Connection Node C 132kV Substation
National Grid (England & Wales)
Oct 2035
Field Glenniston BESS
Battery storage · Field Devco Ltd
200 MWScoping Field Glenniston BESS 132Kv Substation
SP Transmission (south Scotland)
Oct 2032
Fife Battery Storage
Battery storage · Carlton Power Limited
200 MWScoping Westfield 132/33kV
SP Transmission (south Scotland)
Oct 2031
Fleet Farm
Solar + storage · Basingstoke East 2 Renewables Ltd
200 MWScoping Basingstoke East 400kV Substation
National Grid (England & Wales)
Apr 2038
Fort Augustus BESS
Battery storage · Field Devco Ltd
200 MWScoping Fort Augustus 400kV
SSEN Transmission (north Scotland)
Oct 2035
FPE Ayr BESS
Battery storage · Future Power Enterprises Ltd
200 MWScoping Ayr 275/33kV
SP Transmission (south Scotland)
Oct 2037
Frodsham Solar Park
Solar + storage · Frodsham Solar Limited
200 MWScoping Frodsham 132kV
National Grid (England & Wales)
Apr 2037
Fyrish Battery Storage
Battery storage · Field Fyrish Ltd
200 MWScoping Fyrish 132kV Substation
SSEN Transmission (north Scotland)
Oct 2029
Galileo 14 Ltd
Battery storage · Galileo 14 Limited
200 MWScoping Staffordshire Connection Node C 400Kv Substation
National Grid (England & Wales)
Oct 2037
Galileo 15
Battery storage · Galileo 15 Limited
200 MWScoping South Wales West Connection Node B 400kV Substation
National Grid (England & Wales)
Dec 2036
Garscadden Park
Battery storage · Garscadden Park Limited
200 MWScoping Garscadden Park 275kV Substation
SP Transmission (south Scotland)
Oct 2033
Gartclash Farm BESS
Battery storage · South Plean Storage Facility Limited
200 MWScoping Denny North 275/132kV
SP Transmission (south Scotland)
Oct 2028
Gastard BESS
Battery storage · Siriusecodev (Gastard) Ltd
200 MWScoping Melksham B 132KV Substation
National Grid (England & Wales)
Nov 2037
GF Upper Boat
Battery storage · Pulse Clean Energy Spv Franklin Limited
200 MWScoping Upper Boat 275kV Substation
National Grid (England & Wales)
Oct 2028
Giffordland 200Mw Field BESS
Battery storage · Virmati Energy Ltd
200 MWScoping Giffordland 400/132kV
SP Transmission (south Scotland)
Apr 2033
Glenrothes Hybrid BESS & Solar PV
Solar + storage · Tagenergy Development UK Limited
200 MWScoping Conland Substation
SP Transmission (south Scotland)
Oct 2031
Gresham House Mossmoran BESS
Battery storage · Mossmorran Energy Storage Limited
200 MWScoping Loch Gelly Collector 132Kv Substation
SP Transmission (south Scotland)
Oct 2031
Hawthorn BESS
Battery storage · Rewe 8 Limited
200 MWAwaiting Consents Wearside Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
Highview Hunterston East Cryobattery
Battery storage · Hvs Siteco Ltd
200 MWConsents Approved Hunterston East 400kV
SP Transmission (south Scotland)
Oct 2027
Hunterston Battery Storage Facility
Battery storage · Hunterston Grid 1 Ltd
200 MWConsents Approved Hunterston East 400kV substation
SP Transmission (south Scotland)
Mar 2028
Hunterston Energy Storage Facility
Battery storage · Hunterston Grid 1 Ltd
200 MWConsents Approved Ayrshire Grid 400kV Substation
SP Transmission (south Scotland)
Mar 2028
Hylton Bridge - Sunderland
Battery storage · Sse Enterprise Limited
200 MWScoping Wearside Connection Node B 2 400kV Substation
National Grid (England & Wales)
Oct 2039
Isenau Four
Battery storage · Isenau Energy Storage Resources Four Limited
200 MWScoping Corriemoillie 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Jubilee Farm
Solar + storage · Starlight Energy SPV 2 Ltd
200 MWScoping Jubilee Farm 275kV Substation
National Grid (England & Wales)
Aug 2034
Kellhead
Solar + storage · Greentech Projects Holding UK Limited
200 MWScoping Dumfries North 400kV
SP Transmission (south Scotland)
Oct 2037
Kincardine Battery Storage Facility
Battery storage · Kincardine Grid 1 Ltd
200 MWConsents Approved Fife Grid Services Facility 275kV Substation
SP Transmission (south Scotland)
Dec 2028
Kincardine Energy Storage Facility
Battery storage · Kincardine Grid 1 Ltd
200 MWConsents Approved Fife Grid Services Facility 275kV Substation
SP Transmission (south Scotland)
Dec 2028
Kingfisher Farm
Battery storage · Rewe 6 Limited
200 MWScoping Monk Fryston 275kV Substation
National Grid (England & Wales)
Jun 2036
Kirklands Farm BESS
Battery storage · Apatura Battery Ltd
200 MWScoping Westfield 132/33kV
SP Transmission (south Scotland)
Oct 2031
Page 22 of 46

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.