🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Battery storage projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown814219.0 GW in total
In planning609scoping or awaiting consent
Consented or building126closest to connecting
Built79connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

814 projects · page 2 of 17
ProjectCapacityStageConnection siteFrom
Branxton Energy Storage Facility
Battery storage · EastCoastGridServices Ltd
750 MWScoping Branxton 400kV Substation
SP Transmission (south Scotland)
May 2029
Didcot BESS 1
Battery storage · Downing Renewable Developments LLP
750 MWScoping Chiltern Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
FCC Thurcroft BESS
Battery storage · Downing Renewable Developments LLP
750 MWScoping Leeds North Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2035
Thurrock Power Station
Battery storage · Thurrock Flexible Generation Limited
750 MWBuilt Tilbury 275kV Substation
National Grid (England & Wales)
Jun 2026
Little Barford
Battery storage · RWE Generation UK Plc
740 MWBuilt Eaton Socon 400kV Substation
National Grid (England & Wales)
Auchentiber Farm 700MW BESS
Battery storage · GPC 700 Ltd
700 MWScoping Auchentiber Farm BESS 400kV Substation
SP Transmission (south Scotland)
Oct 2029
Walham 700MW BESS
Battery storage · GPC 1154 Ltd
700 MWScoping Walham 400kV Substation
National Grid (England & Wales)
Nov 2033
Carrington
Battery storage · Carrington Storage Limited
680 MWConsents Approved Carrington 400KV Substation
National Grid (England & Wales)
Oct 2027
Exeter BESS
Battery storage · Exeter Storage Limited
680 MWScoping Exeter 400kV Substation
National Grid (England & Wales)
Oct 2037
East Claydon Greener Grid Park
Battery storage · East Claydon Energy Limited
650 MWScoping East Claydon 400kV Substation
National Grid (England & Wales)
Nov 2034
Braybrooke
Battery storage · Sse De Solar Holdco Limited
600 MWScoping Market Harborough 400kV Substation
National Grid (England & Wales)
Jul 2032
Brinsworth
Battery storage · Sse Renewables Solar & Battery Holdings Limited
600 MWScoping Brinsworth B 400kV Substation
National Grid (England & Wales)
Oct 2032
Daines BESS
Battery storage · Sse Daines BESS Limited
600 MWScoping Daines 400kV Substation
National Grid (England & Wales)
Oct 2028
Fancott
Battery storage · Kona Asset 2 Limited
600 MWScoping Sundon 400kV Substation
National Grid (England & Wales)
Oct 2031
Fiddlers Ferry BESS
Battery storage · Fiddlers Ferry Ltd
600 MWConsents Approved Fiddlers Ferry 275kV Substation
National Grid (England & Wales)
Oct 2028
LGB300
Battery storage · LG-B-300
600 MWScoping LGB300 400KV Substation
SSEN Transmission (north Scotland)
Jul 2031
Lightsourcebp Amlwch BESS and Hydrogen
Battery storage · Lightsource Renewable UK Development Limited
600 MWScoping Wylfa South 400kV Substation
National Grid (England & Wales)
Oct 2037
Neilston 400kV Greener Grid Park
Battery storage · Statkraft UK Ltd
600 MWConsents Approved Neilston 400kV Substation
SP Transmission (south Scotland)
Oct 2029
Eggborough
Battery storage · Sse Eggborough Limited
550 MWScoping Eggborough 400kV Substation
National Grid (England & Wales)
Jun 2032
Elmya Towcester BESS
Battery storage · Rpc Elmya Carnation Towcester Limited
550 MWScoping Derbyshire Connection Node I 400kV Substation
National Grid (England & Wales)
Oct 2037
High Netherfauld Farm BESS
Battery storage · Esb (Scotland) Ltd
504 MWScoping Redshaw 400kV
SP Transmission (south Scotland)
Oct 2037
AGS Calderside Battery Energy Storage System
Battery storage · Advance Grid Solutions Limited
500 MWScoping Ags Calderside 275Kv Substation
SP Transmission (south Scotland)
Oct 2033
AGS Harestonhill BESS
Battery storage · AGS Harestonhill Ltd
500 MWScoping AGS Harestonhill BESS 400kV Substation
SP Transmission (south Scotland)
Oct 2030
Akku Tealing Battery Storage
Battery storage · Akku Tealing Limited
500 MWScoping Tealing 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Alcemi Bramford Battery Energy Storage Facility
Battery storage · Alcemi Storage Developments 1 Limited
500 MWScoping Bramford 400kV Substation
National Grid (England & Wales)
Oct 2030
Alcemi Devilla Battery Energy Storage Facility
Battery storage · Alcemi Storage Developments 3 Limited
500 MWConsents Approved Devilla Battery Storage 275kV substation
SP Transmission (south Scotland)
Oct 2027
Alcemi Score 2 Battery Energy Storage Facility
Battery storage · Alcemi Storage Developments 5 Limited
500 MWScoping Alcemi Score Battery 400kV Substation
SSEN Transmission (north Scotland)
Mar 2031
Alcemi Score Battery Energy Storage Facility
Battery storage · Alcemi Storage Developments 5 Limited
500 MWScoping Alcemi Score Battery Energy Storage Facility 400Kv Substation
SSEN Transmission (north Scotland)
Mar 2031
Alyth BESS Station
Battery storage · Igp International Prospecting Limited
500 MWScoping Alyth BESS Station 400Kv Substation
SSEN Transmission (north Scotland)
Oct 2033
Ayr Farm
Battery storage · Braston New Energy Limited
500 MWScoping Ayr Farm Collector Substation
SP Transmission (south Scotland)
May 2028
Baglan BESS IPC
Battery storage · Ipc Grid Connection Two Limited
500 MWScoping South Wales West Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2036
Bankhead BESS
Battery storage · Apatura Project 21 Ltd
500 MWScoping Bankhead 400kV Substation
SP Transmission (south Scotland)
Oct 2033
Bendsmoor BESS
Battery storage · Apatura Battery Ltd
500 MWScoping Bendsmoor BESS 400Kv Substation
SP Transmission (south Scotland)
Jun 2032
Bishopbriggs 500MW BESS
Battery storage · GPC Project 16 Ltd
500 MWScoping Bishopbriggs BESS 400/275kV Substation
SP Transmission (south Scotland)
May 2029
Brae House Farm
Battery storage · Qair Renewables UK Limited
500 MWScoping DOUNREAY 2 275 kV SUBSTATION
SSEN Transmission (north Scotland)
Jul 2032
Brigton of Ruthven BESS
Battery storage · Morris Leslie Limited
500 MWScoping Alyth 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Coalburn Battery Energy Storage Facility
Battery storage · Alcemi Storage Developments 4 Limited
500 MWBuilt Coalburn 400kV Substation
SP Transmission (south Scotland)
Culham Storage
Battery storage · Culham Storage Limited
500 MWConsents Approved Culham Jet 400kV Substation
National Grid (England & Wales)
Oct 2029
Daines NP BESS
Battery storage · Daines Flexpower Limited
500 MWScoping Manchester South connection node A 400kv
National Grid (England & Wales)
Oct 2037
Devonhill
Battery storage · Cbs Energy Storage Assets UK Limited
500 MWScoping Strathaven 400/275kV
SP Transmission (south Scotland)
Oct 2033
Earl Shilton BESS
Battery storage · Exagen Normanton Energy Reserve Limited
500 MWScoping Earl Shilton 275kV
National Grid (England & Wales)
Oct 2029
East Claydon Storage
Battery storage · East Claydon Storage Limited
500 MWScoping East Claydon 400kV Substation
National Grid (England & Wales)
Oct 2026
Eccles BESS
Battery storage · Eccles Energy Centre Limited
500 MWUnder Construction/Commissioning Eccles 400kV Substation
SP Transmission (south Scotland)
Apr 2026
Elstree BESS NP
Battery storage · Elstree Flexpower Ltd
500 MWScoping Elstree B 275Kv Substation
National Grid (England & Wales)
Oct 2037
Feckenham Energy Park
Battery storage · Green Energy Mab Ltd
500 MWScoping Feckenham 400kV Substation
National Grid (England & Wales)
Oct 2033
Greta IV (c)
Battery storage · Greta IV Limited
500 MWScoping North Anglia Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2034
Greta IV (d)
Battery storage · Greta IV Limited
500 MWScoping North Anglia Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2034
Grimsby BESS
Battery storage · Shama BESS Limited
500 MWScoping Grimsby West 400kV Substation
National Grid (England & Wales)
Apr 2035
Hagshaw LDES
Battery storage · Hagshaw Ldes Ltd
500 MWScoping Redshaw 132kV Substation.
SP Transmission (south Scotland)
Oct 2036
Hawkhill BESS
Battery storage · GPC Project 12 Ltd
500 MWScoping Kincardine North 400kV Substation
SP Transmission (south Scotland)
Oct 2031
Page 2 of 17

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.