Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· SPTHigh Netherfauld Farm BESS
High Netherfauld Farm BESS is a 504 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Redshaw 400kV, with capacity due from October 2037. The connection agreement is held by Esb (Scotland) Ltd.
Project stageIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2037 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-005992
- Customer
- Esb (Scotland) Ltd
- Technology
- Energy Storage System
- Total capacity
- 504 MW
- Change in this agreement
- +504 MW
- Capacity effective from
- 31 October 2037
- Connection site
- Redshaw 400kV
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem