Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· NGETEarl Shilton BESS
Earl Shilton BESS is a 500 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Earl Shilton 275kV, with capacity due from October 2029. The connection agreement is held by Exagen Normanton Energy Reserve Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2029 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001950
- Customer
- Exagen Normanton Energy Reserve Limited
- Technology
- Energy Storage System
- Total capacity
- 500 MW
- Change in this agreement
- +500 MW
- Capacity effective from
- 26 October 2029
- Connection site
- Earl Shilton 275kV
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem