Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Auchentiber Farm 700MW BESS

Auchentiber Farm 700MW BESS is a 700 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Auchentiber Farm BESS 400kV Substation, with capacity due from October 2029. The connection agreement is held by GPC 700 Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2029 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003601
Customer
GPC 700 Ltd
Technology
Energy Storage System
Total capacity
700 MW
Change in this agreement
+700 MW
Capacity effective from
17 October 2029
Connection site
Auchentiber Farm BESS 400kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Auchentiber Farm BESS · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem