🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · NGET

East Claydon Greener Grid Park

East Claydon Greener Grid Park is a 650 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at East Claydon 400kV Substation, with capacity due from November 2034. The connection agreement is held by East Claydon Energy Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Nov 2034 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002314
Customer
East Claydon Energy Limited
Technology
Energy Storage System
Total capacity
650 MW
Change in this agreement
+650 MW
Capacity effective from
30 November 2034
Connection site
East Claydon 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near East Claydon · Grid map

Other projects at East Claydon 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem