Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· SPT

Bankhead BESS

Bankhead BESS is a 500 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Bankhead 400kV Substation, with capacity due from October 2033. The connection agreement is held by Apatura Project 21 Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2033 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003236
Customer
Apatura Project 21 Ltd
Technology
Demand, Energy Storage System
Total capacity
500 MW
Change in this agreement
+500 MW
Capacity effective from
30 October 2033
Connection site
Bankhead 400kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Bankhead Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem