BATTERY STORAGE Β· SHET

LGB300

LGB300 is a 600 MW battery storage project in planning, connecting to the SSEN Transmission (north Scotland) network at LGB300 400KV Substation, with capacity due from July 2031. The connection agreement is held by LG-B-300.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Jul 2031 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003907
Customer
LG-B-300
Technology
Energy Storage System
Total capacity
600 MW
Change in this agreement
+600 MW
Capacity effective from
31 July 2031
Connection site
LGB300 400KV Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near LGB Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem