NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue on the SP Transmission (south Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown46789.4 GW in total
In planning319scoping or awaiting consent
Consented or building64closest to connecting
Built84connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

467 projects · page 2 of 10
ProjectCapacityStageConnection siteFrom
Ayr Flexpower
Solar + storage · Ayr Flexpower Limited
450 MWScoping Ayr Dbb 275Kv Substation
SP Transmission (south Scotland)
Oct 2037
Coylton 275kV Greener Grid Park
Battery storage · Coylton Energy Limited
450 MWScoping Coylton 275kV substation
SP Transmission (south Scotland)
Oct 2037
New Cumnock BESS
Solar + storage · New Cumnock BESS Ltd
450 MWScoping New Cumnock 275/132kV Substation
SP Transmission (south Scotland)
Oct 2033
Neart Na Gaoithe Offshore Wind Farm
Offshore wind · Neart Na Gaoithe Offshore Wind Limited
448 MWBuilt Neart Na Gaoithe 220/66KV Offshore Substation
SP Transmission (south Scotland)
Cruachan U3&4 Replacement
Hydro and pumped storage · Drax Pumped Storage Limited
440 MWBuilt Cruachan 275kV Substation
SP Transmission (south Scotland)
Borders Wind Farm
Onshore wind · Edf Energy Renewables Limited
400 MWScoping Borders Windfarm 132kV
SP Transmission (south Scotland)
May 2033
Devol Moor Battery & Solar Project
Battery storage · Sunshine Project 03 Limited
400 MWScoping Devol Moor 400/132kV
SP Transmission (south Scotland)
Sep 2027
Edrom Green Energy Park
Battery storage · Np Spv 45 Limited
400 MWScoping Kelloe Mains 400kV Substation
SP Transmission (south Scotland)
Oct 2033
Elmya Dunbar BESS
Battery storage · Elmya Energy UK 1 Limited
400 MWScoping Thorntonloch 400kV Substation
SP Transmission (south Scotland)
Oct 2031
Elmya Hunterston
Battery storage · Elmya Rpc UK Hunterston Limited
400 MWScoping Keppen Burn 400Kv Substation
SP Transmission (south Scotland)
Oct 2030
Elmya Morningside BESS & PV
Solar + storage · Elmya Rpc UK Morningside Limited
400 MWScoping Elmya Morningside 400kV Substation
SP Transmission (south Scotland)
Oct 2033
Glenside Farm BESS
Battery storage · GPC 1211 Ltd
400 MWScoping Denny North 275/132kV
SP Transmission (south Scotland)
Oct 2031
Gresham House Gretna BESS
Battery storage · Albusia Ltd
400 MWScoping Gresham House Gretna 400/132kv Substation
SP Transmission (south Scotland)
Oct 2031
HECWE Dungavel Wind Farm
Solar + storage · Spirebush Ltd
400 MWAwaiting Consents Spirebush 132kV Substation
SP Transmission (south Scotland)
Jul 2028
Hurlet Battery
Battery storage · P-Frequency Ltd
400 MWScoping Neilston 400kV Substation
SP Transmission (south Scotland)
Oct 2033
Kelloe Mains
Battery storage · Tbc 003 Limited
400 MWScoping Kelloe Mains 400kV Substation
SP Transmission (south Scotland)
Nov 2029
Lagrae Battery Storage
Battery storage · Lagrae Battery Storage Limited
400 MWScoping Glenmuckloch 132kV Substation
SP Transmission (south Scotland)
Oct 2036
Lawfield and Branxton Energy Park
Battery storage · Cairn Duhie Energy Limited
400 MWScoping Lawfield and Branxton Energy Park 400kV Substation
SP Transmission (south Scotland)
Jun 2028
Lightsource Auchans
Battery storage · Lightsource Renewable UK Development Limited
400 MWScoping Linwood 400kV Substation
SP Transmission (south Scotland)
Oct 2033
Motherwell 400MW BESS (Formerly Castlehill BESS)
Battery storage · SPV GPC 3 Ltd
400 MWScoping Newarthill 275 kV Substation
SP Transmission (south Scotland)
Apr 2035
Zenobe Eccles Battery Storage
Battery storage · Zenobe Eccles Limited
400 MWUnder Construction/Commissioning Eccles 400kV Substation
SP Transmission (south Scotland)
Apr 2026
Clyde North
Onshore wind · Clyde Windfarm (Scotland) Limited
375 MWBuilt Clyde North 275/33kV
SP Transmission (south Scotland)
Whitelee
Onshore wind · Scottish Power Renewables (UK) Limited
355 MWScoping Whitelee 275/33kV
SP Transmission (south Scotland)
May 2031
Denny BESS
Battery storage · Igp Energy Storage 3 Limited
350 MWScoping Denny North
SP Transmission (south Scotland)
Oct 2030
Kilmarnock BESS
Battery storage · Kilmarnock Flexpower Ltd
350 MWUnder Construction/Commissioning Boydston 400kV substation
SP Transmission (south Scotland)
Nov 2026
Westfield BESS
Battery storage · Brockwell Energy Limited
350 MWScoping Westfield 400kV Substation
SP Transmission (south Scotland)
Oct 2031
Blacklaw
Wind + storage · Scottish Power Renewables (UK) Limited
340 MWScoping Blacklaw 132/33kV
SP Transmission (south Scotland)
Oct 2032
Pittlesheugh Farm
Battery storage · Pittlesheugh Farm BESS Limited
340 MWScoping Eccles 400/132kV
SP Transmission (south Scotland)
Oct 2030
High Mathernock Battery Storage
Battery storage · Harmony HM Limited
334 MWScoping High Mathernock 132Kv Substation
SP Transmission (south Scotland)
Oct 2029
Arecleoch
Onshore wind · Scottish Power Renewables (UK) Limited
330 MWScoping Arecleoch 132/33kV
SP Transmission (south Scotland)
Jun 2032
Whitelee
Onshore wind · Scottish Power Renewables (UK) Limited
305 MWBuilt Whitelee 275/33kV
SP Transmission (south Scotland)
AGS Calderside Battery Energy Storage System
Battery storage · Advance Grid Solutions Limited
300 MWScoping Ags Calderside 275Kv Substation
SP Transmission (south Scotland)
Oct 2029
Aitkenhead Farm BESS
Battery storage · Aitkenhead Storage Facility Limited
300 MWScoping Clydesmill 275/33kV
SP Transmission (south Scotland)
Apr 2033
Boom Power Seaton Hill Generation HUB
Battery storage · Seatonhill Storage Facility Limited
300 MWScoping Cockenzie 400/275kV
SP Transmission (south Scotland)
Oct 2033
Castlemilk 1
Solar · Queequeg Renewables Ltd
300 MWScoping Castlemilk 400kV Substation
SP Transmission (south Scotland)
Oct 2036
Coylton Farm
Battery storage · New Energy Partnership Limited
300 MWAwaiting Consents Coylton 275/33kV Substation
SP Transmission (south Scotland)
Oct 2037
Craig Moss Farm
Battery storage · Qair Renewables UK Limited
300 MWScoping Craig Moss Farm 132kV Substation
SP Transmission (south Scotland)
Oct 2036
Crossgatehall BESS
Battery storage · De 001 Limited
300 MWScoping Smeaton 400/275kV
SP Transmission (south Scotland)
Oct 2033
Elmya Bathgate BESS
Battery storage · Rpc Elmya Carnation Bathgate Limited
300 MWScoping Armadale 400kv Substation
SP Transmission (south Scotland)
Oct 2031
Grangemouth Hybrid BESS & Solar PV
Solar + storage · Tagenergy Development UK Limited
300 MWScoping Letham 400/275kV substation
SP Transmission (south Scotland)
Jun 2032
Gresham House Dalmarnock BESS
Battery storage · Energyhubdevelopments Limited
300 MWScoping Gresham House Dalmarnock Bess 132kv Substation
SP Transmission (south Scotland)
Apr 2030
Gresham House Kincardine BESS
Battery storage · Flavusia Ltd
300 MWScoping Gresham House Kincardine BESS 275/132kV substation
SP Transmission (south Scotland)
Oct 2029
Newarthill Energy Park
Battery storage · Dalzell (Newarthill) Ltd
300 MWScoping Newarthill Energy Park 275kV Substation
SP Transmission (south Scotland)
Oct 2029
Red Moss Farm
Battery storage · Qair Renewables UK Limited
300 MWScoping Red Moss Farm 132kV Substation
SP Transmission (south Scotland)
May 2031
Strathaven BESS
Battery storage · Igp Energy Storage 2 Limited
300 MWScoping Strathaven 400kV Substation
SP Transmission (south Scotland)
Oct 2033
Zenobe Kilmarnock South
Battery storage · Zenobe Kilmarnock South Limited
300 MWBuilt Kilmarnock South 400kV Substation
SP Transmission (south Scotland)
Knarie
Wind + storage · Invenergy Development UK Ltd
297 MWAwaiting Consents Narie 400/132kV Substation
SP Transmission (south Scotland)
Oct 2036
Alcemi Armadale BESS
Battery storage · Alcemi Storage Developments 8 Ltd
280 MWScoping Whitburn 400kV substation
SP Transmission (south Scotland)
Oct 2030
Bodinglee Wind Farm
Wind + storage · Bodinglee Wind Farm Limited
280 MWAwaiting Consents Bodinglee Wind Farm 132kV
SP Transmission (south Scotland)
Apr 2029
Kilgallioch Wind Farm
Onshore wind · Scottish Power Renewables (UK) Limited
274 MWBuilt Kilgallioch 275kV Substation
SP Transmission (south Scotland)
Page 2 of 10

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.