Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SPTDevol Moor Battery & Solar Project
Devol Moor Battery & Solar Project is a 400 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Devol Moor 400/132kV, with capacity due from September 2027. The connection agreement is held by Sunshine Project 03 Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Sep 2027 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004084
- Customer
- Sunshine Project 03 Limited
- Technology
- Energy Storage System
- Total capacity
- 400 MW
- Change in this agreement
- +400 MW
- Capacity effective from
- 27 September 2027
- Connection site
- Devol Moor 400/132kV
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem