Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Zenobe Eccles Battery Storage

Zenobe Eccles Battery Storage is a 400 MW battery storage project under construction or commissioning, connecting to the SP Transmission (south Scotland) network at Eccles 400kV Substation, with capacity due from April 2026. The connection agreement is held by Zenobe Eccles Limited.

Project stageUnder construction
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (current stage)
  4. OperatingFrom Apr 2026 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001779
Customer
Zenobe Eccles Limited
Technology
Energy Storage System
Total capacity
400 MW
Change in this agreement
+400 MW
Capacity effective from
30 April 2026
Connection site
Eccles 400kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Under Construction/Commissioning
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Eccles · Grid map

Other projects at Eccles 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem