Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown1,590616.3 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

1,590 projects · page 10 of 32
ProjectCapacityStageConnection siteFrom
Caithness Energy Storage
Battery storage · Baywa R.e. UK Limited
456 MWScoping Caithness Energy Storage 400Kv Substation
SSEN Transmission (north Scotland)
Oct 2034
Alderton PV & BESS Station
Solar + storage · Bnrg Albion Limited
450 MWScoping East Claydon 400kV Substation
National Grid (England & Wales)
Oct 2037
Alyth
Solar + storage · Ecodev (Alyth) Ltd
450 MWScoping Alyth Solar and Battery 400/132kV
SSEN Transmission (north Scotland)
Oct 2029
Ayr Flexpower
Solar + storage · Ayr Flexpower Limited
450 MWScoping Ayr Dbb 275Kv Substation
SP Transmission (south Scotland)
Oct 2037
Blyth BESS
Battery storage · Sse Renewables Solar & Battery Holdings Limited
450 MWScoping Blyth 275kV Substation
National Grid (England & Wales)
Oct 2036
Coylton 275kV Greener Grid Park
Battery storage · Coylton Energy Limited
450 MWScoping Coylton 275kV substation
SP Transmission (south Scotland)
Oct 2037
New Cumnock BESS
Solar + storage · New Cumnock BESS Ltd
450 MWScoping New Cumnock 275/132kV Substation
SP Transmission (south Scotland)
Oct 2033
Ninfield Greener Grid Park
Battery storage · Ninfield Grid Solutions Limited
450 MWScoping Ninfield 400kV Substation
National Grid (England & Wales)
Oct 2037
Yaxley GEC (Ethos Green)
Solar + storage · Yaxley Green Energy Centre Ltd
450 MWAwaiting Consents Yaxley 400kV Substation
National Grid (England & Wales)
Oct 2031
Kell440Mw BESS
Battery storage · Care Power (Kellingley) Limited
440 MWScoping Kellingley IDNO GSP
National Grid (England & Wales)
Oct 2035
Overton440Mw BESS
Battery storage · Care Power (Overton) Limited
440 MWScoping North Humber Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2035
Pollington Hybrid
Solar + storage · Edf Energy Renewables Limited
440 MWScoping Leeds North Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
Indian Queens
Solar + storage · Gridmove Ltd
437 MWScoping Indian Queens 400kV Substation
National Grid (England & Wales)
Oct 2031
Kenwick Solar
Solar · Anesco Limited
431 MWScoping Shrewsbury 400kV Substation
National Grid (England & Wales)
Oct 2037
Noventum - Stocksbridge
Battery storage · Noventum Power Solar 14 Limited
410 MWScoping Leeds South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2035
Alyth Energy Storage And Solar
Solar + storage · Private Energy Partners (UK) Ltd
400 MWScoping Alyth 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Bicker Drove
Battery storage · Rewe 1 Limited
400 MWScoping Navenby 400kV Substation
National Grid (England & Wales)
May 2034
Bicker Fen
Solar + storage · Ib Vogt UK Ltd
400 MWScoping Trent Valley South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2034
Boom Power Feckenham Generation Hub
Solar + storage · Wheaten Hill BESS Limited
400 MWScoping Feckenham 400kV Substation
National Grid (England & Wales)
Oct 2033
Borders Wind Farm
Onshore wind · Edf Energy Renewables Limited
400 MWScoping Borders Windfarm 132kV
SP Transmission (south Scotland)
May 2033
Btgbbik01 - Bicker Fen 400Mw BESS
Battery storage · Field Bicker Fen Ltd
400 MWScoping Trent Valley South Connection Node A 400k
National Grid (England & Wales)
Oct 2039
Capenhurst
Solar + storage · Enso Green Holdings Q Limited
400 MWScoping Capenhurst 275kV Substation
National Grid (England & Wales)
Sep 2033
Cellarhead
Solar + storage · Enso Green Holdings X Limited
400 MWScoping Cellarhead 400kV Substation
National Grid (England & Wales)
Oct 2033
Cellarhead Green Energy Centre
Solar + storage · S & C Energy Limited
400 MWAwaiting Consents Cellarhead 400kV Substation
National Grid (England & Wales)
Oct 2028
Cellarhead PV & BESS Station
Solar + storage · Ib Vogt UK Ltd
400 MWScoping Manchester South Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2037
Celtic Offshore Wind Farm
Offshore wind · RWE Offshore Wind
400 MWScoping Rwe Celtic Offshore Substation
National Grid (England & Wales)
Oct 2031
Chickerell
Solar + storage · Enso Green Holdings X Limited
400 MWAwaiting Consents Chickerell 400kV Substation
National Grid (England & Wales)
Oct 2038
Church Road Farm
Battery storage · Qair Renewables UK Limited
400 MWScoping South Anglia Connection Node D 132kV Substation
National Grid (England & Wales)
Oct 2034
Cilfynydd
Solar + storage · Enso Green Holdings X Limited
400 MWAwaiting Consents Cilfynydd 400kV Substation
National Grid (England & Wales)
Oct 2030
Cilfynydd Green Energy Centre
Solar + storage · Cilfynydd Ng Limited
400 MWAwaiting Consents Cilfynydd 400kV Substation
National Grid (England & Wales)
Oct 2029
Coachford 400MW BESS
Battery storage · Field Woodhead Ltd
400 MWScoping Coachford 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Cottam-Ryhall Solar & BESS
Solar + storage · Crh Renewables Limited
400 MWScoping Trent Valley South Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2034
Drax Solar
Solar · East Yorkshire Solar Farm Limited
400 MWScoping Drax 400kV Substation
National Grid (England & Wales)
Sep 2029
Devol Moor Battery & Solar Project
Battery storage · Sunshine Project 03 Limited
400 MWScoping Devol Moor 400/132kV
SP Transmission (south Scotland)
Sep 2027
Dogger Bank South East
Offshore wind · RWE Renewables UK Dogger Bank South (East) Limited
400 MWScoping Birkhill Wood 400kV Substation
National Grid (England & Wales)
Oct 2030
Dogger Bank South West
Offshore wind · Rwe Renewables UK Dogger Bank South (West) Limited
400 MWScoping Birkhill Wood 400kV Substation
National Grid (England & Wales)
Oct 2030
Drakelow Green Energy Centre
Solar + storage · Drakelow Ng Limited
400 MWAwaiting Consents Drakelow 400kV Substation
National Grid (England & Wales)
Apr 2028
Drakelow PV & BESS Station
Solar + storage · IBV Elford Park Solar Limited
400 MWScoping Drakelow 400kV Substation
National Grid (England & Wales)
Oct 2037
Dunclent Battery Storage
Battery storage · Firma Vogt Solar Ltd
400 MWScoping Warwickshire Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Edrom Green Energy Park
Battery storage · Np Spv 45 Limited
400 MWScoping Kelloe Mains 400kV Substation
SP Transmission (south Scotland)
Oct 2033
Elmya Dunbar BESS
Battery storage · Elmya Energy UK 1 Limited
400 MWScoping Thorntonloch 400kV Substation
SP Transmission (south Scotland)
Oct 2031
Elmya Hunterston
Battery storage · Elmya Rpc UK Hunterston Limited
400 MWScoping Keppen Burn 400Kv Substation
SP Transmission (south Scotland)
Oct 2030
Elmya Morningside BESS & PV
Solar + storage · Elmya Rpc UK Morningside Limited
400 MWScoping Elmya Morningside 400kV Substation
SP Transmission (south Scotland)
Oct 2033
ER MKH Energy
Solar + storage · Er Project Development Co Limited
400 MWScoping Market Harborough 400kV Substation
National Grid (England & Wales)
Oct 2033
Exeter Main
Solar + storage · Enso Green Holdings X Limited
400 MWScoping Exeter 400kV Substation
National Grid (England & Wales)
Oct 2033
Feckenham
Solar + storage · Enso Green Holdings X Limited
400 MWAwaiting Consents Feckenham 400kV Substation
National Grid (England & Wales)
Oct 2036
Feckenham PV & BESS Station
Solar + storage · Ib Vogt UK Ltd
400 MWScoping Feckenham 400kV Substation
National Grid (England & Wales)
Oct 2037
Field Kinardochy BESS
Battery storage · Field Kinardochy Ltd
400 MWScoping Kinardochy Substation 400/275kV
SSEN Transmission (north Scotland)
Oct 2035
GF Norwich BESS
Battery storage · GF Norwich Energy Ltd
400 MWScoping NORTH ANGLIA CONNECTION NODE A 400kV SUBSTATION
National Grid (England & Wales)
Oct 2034
GF Thornton Energy BESS
Battery storage · Thornton Energy Ltd
400 MWScoping North Humber Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2035
Page 10 of 32

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.