Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · NGETDrakelow Green Energy Centre
Drakelow Green Energy Centre is a 400 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Drakelow 400kV Substation, with capacity due from April 2028. The connection agreement is held by Drakelow Ng Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Apr 2028 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001693-1
- Customer
- Drakelow Ng Limited
- Technology
- Demand, Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 400 MW
- Change in this agreement
- +400 MW
- Capacity effective from
- 30 April 2028
- Connection site
- Drakelow 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Awaiting Consents
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Drakelow 400kV Substation
- Drakelow Green Energy CentreSolar + storage · 1.0 GW · Awaiting Consents
- Greta IIISolar + storage · 500 MW · Consents Approved
- Drakelow PV & BESS StationSolar + storage · 400 MW · Scoping
- Powersite @ DrakelowGas · 380 MW · Under Construction/Commissioning
- Caldwell RoadBattery storage · 249 MW · Scoping
- Walton Road Energy ProjectSolar + storage · 240 MW · Scoping
- Drakelow BESSBattery storage · 200 MW · Consents Approved
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem