Grid infrastructure › Connection queue › Gas

GAS · NGET

Powersite @ Drakelow

Powersite @ Drakelow is a 380 MW gas project under construction or commissioning, connecting to the National Grid (England & Wales) network at Drakelow 400kV Substation, with capacity due from October 2020. The connection agreement is held by Powersite Ltd.

Project stageUnder construction
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (current stage)
  4. OperatingFrom Oct 2020 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000364
Customer
Powersite Ltd
Technology
CCGT (Combined Cycle Gas Turbine)
Total capacity
380 MW
Change in this agreement
+380 MW
Capacity effective from
1 October 2020
Connection site
Drakelow 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Under Construction/Commissioning

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Drakelow · Grid map

Other projects at Drakelow 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem