Grid infrastructure β€Ί Connection queue β€Ί Solar + storage

SOLAR + STORAGE Β· NGET

Greta III

Greta III is a 500 MW solar + storage project consented, connecting to the National Grid (England & Wales) network at Drakelow 400kV Substation, with capacity due from October 2029. The connection agreement is held by Tagenergy Development UK Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2029 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001803
Customer
Tagenergy Development UK Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
500 MW
Change in this agreement
+500 MW
Capacity effective from
30 October 2029
Connection site
Drakelow 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Consents Approved

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Drakelow Β· Grid map

Other projects at Drakelow 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem