United States โบ Power plants โบ Battery storage
OCTARY USA ยท BATTERY STORAGECancelled battery storage sites in the USA
Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.
Operating1,086plants
Operating capacity56.1 GWnameplate
Under construction23.3 GW230 plants
Whole pipeline64.2 GWplanned, approved and building
Map
Loading plantsโฆ
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
142 plants ยท page 1 of 3
| Plant | Capacity | Stage |
|---|---|---|
| Sun Bear | 756 MW | Withdrawn / abandoned |
| Goldenrod Creek Solar and BESS SLF | 660 MW | Withdrawn / abandoned |
| Lunis Creek Solar and BESS SLF | 621 MW | Withdrawn / abandoned |
| Hollow Branch Creek | 460 MW | Withdrawn / abandoned |
| Dogwood Creek Solar and BESS | 443 MW | Withdrawn / abandoned |
| Brittlebush Solar and Battery Storage | 400 MW | Withdrawn / abandoned |
| Tehuacana Creek 2 Solar and BESS | 359 MW | Withdrawn / abandoned |
| Apex Bethel Energy Center | 317 MW | Withdrawn / abandoned |
| Ravenswood | 316 MW | Withdrawn / abandoned |
| Atlas | 300 MW | Withdrawn / abandoned |
| Box Canyon (AZ) | 300 MW | Withdrawn / abandoned |
| Hecate Grid Intrepid | 300 MW | Withdrawn / abandoned |
| Kingbird Solar Energy LLC | 300 MW | Withdrawn / abandoned |
| Hot Pot Solar | 280 MW | Withdrawn / abandoned |
| OCI SunRoper | 260 MW | Withdrawn / abandoned |
| Emerald Hill Energy Storage | 250 MW | Withdrawn / abandoned |
| Pasilla Solar and Battery Storage | 250 MW | Withdrawn / abandoned |
| Aragon Energy Storage | 225 MW | Withdrawn / abandoned |
| Fort Watt Storage | 200 MW | Withdrawn / abandoned |
| Iron Point Solar (Hybrid) | 200 MW | Withdrawn / abandoned |
| Jerboa Storage | 200 MW | Withdrawn / abandoned |
| Juniper Gulch Solar and Storage | 200 MW | Withdrawn / abandoned |
| KCE NY 35, LLC | 200 MW | Withdrawn / abandoned |
| Malala | 200 MW | Withdrawn / abandoned |
| Opportunity Solar Generation and BESS | 200 MW | Withdrawn / abandoned |
| Sinclair BESS | 200 MW | Withdrawn / abandoned |
| Wallie Storage | 200 MW | Withdrawn / abandoned |
| Chuckwalla Solar, LLC | 180 MW | Withdrawn / abandoned |
| Augite Storage | 151 MW | Withdrawn / abandoned |
| Windmill Ridge Storage | 151 MW | Withdrawn / abandoned |
| Mcgee Storage | 151 MW | Withdrawn / abandoned |
| Alamo 7 BESS 1 | 150 MW | Withdrawn / abandoned |
| Alamo 7 BESS 2 | 150 MW | Withdrawn / abandoned |
| Crane 2 BESS 2 | 150 MW | Withdrawn / abandoned |
| Grey Fox Wind | 150 MW | Withdrawn / abandoned |
| Issa Solar | 150 MW | Withdrawn / abandoned |
| Matador Solar | 150 MW | Withdrawn / abandoned |
| May Solar | 150 MW | Withdrawn / abandoned |
| Peregrine BESS 1 | 150 MW | Withdrawn / abandoned |
| Peregrine BESS 2 | 150 MW | Withdrawn / abandoned |
| Trestles Grid LLC | 150 MW | Withdrawn / abandoned |
| Twins Solar | 150 MW | Withdrawn / abandoned |
| Upton BESS 2 | 150 MW | Withdrawn / abandoned |
| Uvalde 2 BESS 2 | 150 MW | Withdrawn / abandoned |
| Wolf Creek Solar | 150 MW | Withdrawn / abandoned |
| Coati Solar, LLC | 140 MW | Withdrawn / abandoned |
| Sunday Solar | 140 MW | Withdrawn / abandoned |
| Swiftsure | 121 MW | Withdrawn / abandoned |
| Echols Grove Solar | 101 MW | Withdrawn / abandoned |
| Jim Wells BESS | 100 MW | Withdrawn / abandoned |
Page 1 of 3
Next โ
Operating capacity by state
Click a state to drill down.
AK134MWME239MWVT21MWNH14MWWA4MWID659MWMTโNDโMN23MWIL82MWWI315MWMI120MWNY290MWRI3MWMA742MWOR523MWNV2.1GWWYโSD1MWIA110MWIN587MWOH29MWPA55MWNJ130MWCT2MWCA17GWUT1.1GWCO670MWNE9MWMOโKYโWV111MWVA231MWMD12MWDEโAZ6.9GWNM1.4GWKSโAR28MWTNโNC372MWSC88MWDCโOK432MWLAโMS152MWAL111MWGA864MWHI515MWTX19GWFL1.2GW
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Solar Proponent LLC4 plants ยท 2,084 MW
- Consolidated Edison Development Inc.11 plants ยท 1,227 MW
- Alpin Holding LLC8 plants ยท 1,060 MW
- Cypress Creek Renewables6 plants ยท 1,000 MW
- MS11 plants ยท 756 MW
- Belltown Power Texas 2, LLC6 plants ยท 587 MW
- Key Capture Energy5 plants ยท 520 MW
- Nevada Power Co2 plants ยท 480 MW
- Parliament Energy Holdings LLC1 plants ยท 460 MW
- 210MS 8me, LLC1 plants ยท 400 MW
- 174 Power Global Corp.2 plants ยท 360 MW
- Vesper Energy Development LLC2 plants ยท 350 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map