United States › Power plants › Battery storage › Washington
BATTERY STORAGESinclair BESS
Sinclair BESS is a 200 MW cancelled battery storage site in Jefferson County, Washington, operated by SINC bn, LLC.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| SINC | Batteries | 200 MW | Cancelled or postponed |
Plant details
- Operator
- SINC bn, LLC
- Location
- Jefferson County, Washington
- Balancing authority
- PSEI
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 200 MW
- EIA plant ID
- 68300
Location
47.5385, -122.6970
Nearby power plants
- West Point Treatment PlantBioenergy plants · 4.6 MW · 14.4 mi
- AGATE BESSBattery storage · 170 MW · 16.4 mi
- Rocky Brook HydroelectricHydroelectric plants · 1.6 MW · 17.0 mi
- University of Washington Power PlantGas power plants, Oil-fired power plants · 15.0 MW · 20.0 mi
- Lilliwaup Falls GeneratingHydroelectric plants · 1.4 MW · 20.1 mi
- Cushman 2Hydroelectric plants · 84.6 MW · 24.6 mi
- Cushman 1Hydroelectric plants · 50.4 MW · 26.0 mi
- Greenwater BESSBattery storage · 200 MW · 30.3 mi
- Cedar HillsBioenergy plants · 5.4 MW · 31.1 mi
- Frederickson Power LPGas power plants · 318 MW · 34.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem