🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Battery storage › Washington

BATTERY STORAGE

Sinclair BESS

Sinclair BESS is a 200 MW cancelled battery storage site in Jefferson County, Washington, operated by SINC bn, LLC.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore battery storage sites in Washington

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
SINCBatteries200 MW Cancelled or postponed

Plant details

Operator
SINC bn, LLC
Location
Jefferson County, Washington
Balancing authority
PSEI
Sector
IPP Non-CHP
Capacity
Cancelled: 200 MW
EIA plant ID
68300

Location

47.5385, -122.6970

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem