United States › Power plants › Battery storage › Washington
BATTERY STORAGEAGATE BESS
AGATE BESS is a 170 MW planned battery storage site in Kitsap County, Washington, operated by BrightNight Power.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Feb 2029 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Feb 2029.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| AGAT | Batteries | 170 MW | Regulatory approvals pending |
Plant details
- Operator
- BrightNight Power
- Location
- Kitsap County, Washington
- Balancing authority
- PSEI
- Sector
- IPP Non-CHP
- Capacity
- Planned: 170 MW
- EIA plant ID
- 68366
Location
47.7688, -122.6078
Nearby power plants
- West Point Treatment PlantBioenergy plants · 4.6 MW · 10.6 mi
- Rocky Brook HydroelectricHydroelectric plants · 1.6 MW · 15.9 mi
- University of Washington Power PlantGas power plants, Oil-fired power plants · 15.0 MW · 16.2 mi
- Port Townsend PaperBioenergy plants · 7.5 MW · 24.0 mi
- Lilliwaup Falls GeneratingHydroelectric plants · 1.4 MW · 31.4 mi
- Cedar HillsBioenergy plants · 5.4 MW · 34.1 mi
- Arlington MicrogridSolar farms, Battery storage · 1.5 MW · 34.1 mi
- Arlington Battery Energy Storage SystemBattery storage · 25.0 MW · 34.3 mi
- Cushman 1Hydroelectric plants · 50.4 MW · 37.6 mi
- Cushman 2Hydroelectric plants · 84.6 MW · 37.7 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem