United States › Power plants › Battery storage › Washington
BATTERY STORAGEArlington Battery Energy Storage System
Arlington Battery Energy Storage System is a 25.0 MW under construction battery storage site in Snohomish County, Washington, operated by PUD No 1 of Snohomish County - (WA).
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Oct 2026 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Oct 2026.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| ABESS | Batteries | 25 MW | Under construction (over 50%) |
Plant details
- Operator
- PUD No 1 of Snohomish County - (WA)
- Location
- Snohomish County, Washington
- Balancing authority
- BPAT
- Sector
- Electric Utility
- Capacity
- Under construction: 25.0 MW
- EIA plant ID
- 67669
Location
48.1562, -122.1437
Nearby power plants
- Arlington MicrogridSolar farms, Battery storage · 1.5 MW · 0.3 mi
- H M JacksonHydroelectric plants · 112 MW · 22.9 mi
- Sierra Pacific Burlington FacilityBioenergy plants · 28.0 MW · 24.2 mi
- Fredonia (WA)Gas power plants · 376 MW · 24.7 mi
- DarringtonBioenergy plants · 4.5 MW · 26.2 mi
- HF Sinclair Puget Sound RefiningGas power plants · 140 MW · 29.0 mi
- Youngs Creek Hydroelectric ProjectHydroelectric plants · 7.5 MW · 29.8 mi
- Port Townsend PaperBioenergy plants · 7.5 MW · 30.4 mi
- Lower BakerHydroelectric plants · 104 MW · 32.8 mi
- AGATE BESSBattery storage · 170 MW · 34.3 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem