🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Battery storage › Texas

BATTERY STORAGE

Uvalde 2 BESS 2

Uvalde 2 BESS 2 is a 150 MW cancelled battery storage site in Uvalde County, Texas, operated by Consolidated Edison Development Inc..

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore battery storage sites in Texas

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
UVBS2Batteries150 MW Cancelled or postponed

Plant details

Operator
Consolidated Edison Development Inc.
Location
Uvalde County, Texas
Balancing authority
ERCO
Sector
IPP Non-CHP
Capacity
Cancelled: 150 MW
EIA plant ID
66305

Location

29.2259, -99.6992

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem