United States › Power plants › Solar farms › Idaho
SOLAR FARMS · BATTERY STORAGEJuniper Gulch Solar and Storage
Juniper Gulch Solar and Storage is a 400 MW cancelled solar and battery storage plant in Clark County, Idaho, operated by JUGU bn, LLC.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| JUGU1 | Solar Photovoltaic | 200 MW | Cancelled or postponed |
| JUGU2 | Batteries | 200 MW | Cancelled or postponed |
Plant details
- Operator
- JUGU bn, LLC
- Location
- Clark County, Idaho
- Balancing authority
- PACE
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 400 MW
- EIA plant ID
- 68291
Location
44.0900, -112.6130
Nearby power plants
- Birch Creek PowerHydroelectric plants · 2.6 MW · 6.8 mi
- Dry Creek ProjectHydroelectric plants · 3.6 MW · 6.8 mi
- Kettle Butte Digester, LLCBioenergy plants · 1.8 MW · 35.7 mi
- Arco Wind and Solar ProjectWind farms · 359 MW · 37.8 mi
- Upper Power PlantHydroelectric plants · 8.0 MW · 46.5 mi
- City Power PlantHydroelectric plants · 8.0 MW · 50.1 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem