πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Solar farms β€Ί Idaho

OCTARY USA Β· SOLAR FARMS

Solar farms in Idaho

Every utility-scale solar farm in the United States of 1 MW or more: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.

Operating14plants
Operating capacity827 MWnameplate
Under construction400 MW1 plants
Whole pipeline500 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

16 plants
PlantCapacityStageStateOwner / operatorYear
Blacks Creek Solar 400 MW Under construction ID
Ada
Blacks Creek Energy Center, LLC 2027
Matrix Pleasant Valley 200 MW Operating ID
Ada
Pleasant Valley Solar, LLC 2025
Pleasant Valley Solar 2 Project 125 MW Operating ID
Ada
PVS 2, LLC 2026
Jackpot Solar, LLC 120 MW Operating ID
Twin Falls
Deriva Energy 2022
Crimson Orchard Solar and BESS 100 MW In planning ID
Elmore
Clenera DevCo LLC 2027
Franklin Solar Hybrid 100 MW Operating ID
Twin Falls
Franklin Solar Idaho 2024
Grand View Solar Two 80.0 MW Operating ID
Elmore
Grand View PV Solar Two, LLC 2016
Black Mesa Solar, LLC 40.0 MW Operating ID
Elmore
Black Mesa Solar, LLC 2023
ID Solar 40.0 MW Operating ID
Ada
AES Distributed Energy 2016
American Falls Solar 20.0 MW Operating ID
Power
American Falls Solar LLC 2017
American Falls Solar II 20.0 MW Operating ID
Power
American Falls Solar II, LLC 2017
Mt. Home Solar 1, LLC 20.0 MW Operating ID
Elmore
Standard Solar 2017
Murphy Flat Solar 20.0 MW Operating ID
Owyhee
Murphy Flat Power, LLC 2017
Orchard Ranch Solar 20.0 MW Operating ID
Ada
Orchard Ranch Solar, LLC 2017
Simcoe Solar 20.0 MW Operating ID
Elmore
Simcoe Solar 2017
Clif Bar Bakery of Twin Falls 1.6 MW Operating ID
Twin Falls
Mondelez Global LLC (Twin Falls) 2019

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map