United States βΊ Power plants βΊ Solar farms βΊ Idaho
OCTARY USA Β· SOLAR FARMSSolar farms in Idaho
Every utility-scale solar farm in the United States of 1 MW or more: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Operating14plants
Operating capacity827 MWnameplate
Under construction400 MW1 plants
Whole pipeline500 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
16 plants
| Plant | Capacity | Stage |
|---|---|---|
| Blacks Creek Solar | 400 MW | Under construction |
| Matrix Pleasant Valley | 200 MW | |
| Pleasant Valley Solar 2 Project | 125 MW | |
| Jackpot Solar, LLC | 120 MW | |
| Crimson Orchard Solar and BESS | 100 MW | In planning |
| Franklin Solar Hybrid | 100 MW | |
| Grand View Solar Two | 80.0 MW | |
| Black Mesa Solar, LLC | 40.0 MW | |
| ID Solar | 40.0 MW | |
| American Falls Solar | 20.0 MW | |
| American Falls Solar II | 20.0 MW | |
| Mt. Home Solar 1, LLC | 20.0 MW | |
| Murphy Flat Solar | 20.0 MW | |
| Orchard Ranch Solar | 20.0 MW | |
| Simcoe Solar | 20.0 MW | |
| Clif Bar Bakery of Twin Falls | 1.6 MW |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Blacks Creek Energy Center, LLC1 plants Β· 400 MW
- Pleasant Valley Solar, LLC1 plants Β· 200 MW
- PVS 2, LLC1 plants Β· 125 MW
- Deriva Energy1 plants Β· 120 MW
- Clenera DevCo LLC1 plants Β· 100 MW
- Franklin Solar Idaho1 plants Β· 100 MW
- Grand View PV Solar Two, LLC1 plants Β· 80.0 MW
- Black Mesa Solar, LLC1 plants Β· 40.0 MW
- AES Distributed Energy1 plants Β· 40.0 MW
- Murphy Flat Power, LLC1 plants Β· 20.0 MW
- Orchard Ranch Solar, LLC1 plants Β· 20.0 MW
- Simcoe Solar1 plants Β· 20.0 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map