United States βΊ Power plants βΊ Solar farms βΊ Texas
SOLAR FARMSOCI SunRoper
OCI SunRoper is a 260 MW planned solar farm in Wharton County, Texas, operated by OCI Energy LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2027. This plant has generators at more than one stage; see the table below.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| OCIRO | Solar Photovoltaic | 260 MW | Regulatory approvals pending |
| OCIES | Batteries | 260 MW | Cancelled or postponed |
Plant details
- Operator
- OCI Energy LLC
- Location
- Wharton County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 260 MW
Cancelled: 260 MW - EIA plant ID
- 65893
Location
29.2404, -96.0115
Nearby power plants
- Lane City WindWind farms Β· 203 MW Β· 2.4 mi
- Cascade Solar (TX)Solar farms Β· 10.0 MW Β· 2.5 mi
- GulfStar Power, LLCSolar farms, Battery storage Β· 752 MW Β· 4.3 mi
- Colorado Bend IIGas power plants Β· 1,230 MW Β· 4.7 mi
- Colorado Bend Energy CenterGas power plants Β· 654 MW Β· 4.7 mi
- ErinSolar farms Β· 202 MW Β· 5.3 mi
- Texas Gulf SulphurGas power plants Β· 102 MW Β· 6.9 mi
- PledgerBattery storage Β· 9.5 MW Β· 7.0 mi
- I-Eye ESSBattery storage Β· 10.0 MW Β· 7.7 mi
- Wittig Solar ParkSolar farms Β· 96.0 MW Β· 8.3 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem