🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Solar farms › Nevada

SOLAR FARMS · BATTERY STORAGE

Hot Pot Solar

Hot Pot Solar is a 630 MW cancelled solar and battery storage plant in Humboldt County, Nevada, operated by Nevada Power Co.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore solar farms in Nevada

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
HPSSolar Photovoltaic350 MW Cancelled or postponed
HPBBatteries280 MW Cancelled or postponed

Plant details

Operator
Nevada Power Co
Location
Humboldt County, Nevada
Balancing authority
NEVP
Sector
Electric Utility
Capacity
Cancelled: 630 MW
EIA plant ID
65419

Location

40.8879, -117.1305

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem