United States › Power plants › Solar farms › Nevada
SOLAR FARMS · BATTERY STORAGEHot Pot Solar
Hot Pot Solar is a 630 MW cancelled solar and battery storage plant in Humboldt County, Nevada, operated by Nevada Power Co.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| HPS | Solar Photovoltaic | 350 MW | Cancelled or postponed |
| HPB | Batteries | 280 MW | Cancelled or postponed |
Plant details
- Operator
- Nevada Power Co
- Location
- Humboldt County, Nevada
- Balancing authority
- NEVP
- Sector
- Electric Utility
- Capacity
- Cancelled: 630 MW
- EIA plant ID
- 65419
Location
40.8879, -117.1305
Nearby power plants
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem