🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Solar farms › Texas

SOLAR FARMS · BATTERY STORAGE

Tehuacana Creek 2 Solar and BESS

Tehuacana Creek 2 Solar and BESS is a 1,059 MW cancelled solar and battery storage plant in Navarro County, Texas, operated by Solar Proponent LLC.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore solar farms in Texas

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
TE2PVSolar Photovoltaic700 MW Cancelled or postponed
TE2BSBatteries359 MW Cancelled or postponed

Plant details

Operator
Solar Proponent LLC
Location
Navarro County, Texas
Balancing authority
ERCO
Sector
IPP Non-CHP
Capacity
Cancelled: 1,059 MW
EIA plant ID
65856

Location

31.9141, -96.4135

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem