United States › Power plants › Battery storage › Texas
BATTERY STORAGE · SOLAR FARMSElm Flats Solar
Elm Flats Solar is a 375 MW under construction power plant in Navarro County, Texas, operated by Headwater Energy, LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Sep 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Sep 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| ELMBA | Batteries | 250 MW | Under construction (up to 50%) |
| ELMFL | Solar Photovoltaic | 125 MW | Under construction (up to 50%) |
Plant details
- Operator
- Headwater Energy, LLC
- Location
- Navarro County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 375 MW
- EIA plant ID
- 67552
Location
32.1136, -96.3048
Nearby power plants
- Bluebonnet Prairie WindWind farms · 170 MW · 2.1 mi
- Fence Post Solar Hybrid Project, LLCSolar farms, Battery storage · 308 MW · 5.5 mi
- WAL565Gas power plants · 1.2 MW · 5.9 mi
- Gaia HybridSolar farms, Battery storage · 230 MW · 7.2 mi
- Main Horn SolarSolar farms · 100 MW · 9.6 mi
- Armadillo Solar CenterSolar farms · 175 MW · 9.9 mi
- Whistle SolarSolar farms · 56.3 MW · 11.8 mi
- Trinidad (TX)Gas power plants, Oil-fired power plants · 243 MW · 11.9 mi
- Oak Valley SolarSolar farms · 251 MW · 13.4 mi
- Wensowitch Solar ParkSolar farms · 146 MW · 13.5 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem