🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Battery storage › Texas

BATTERY STORAGE

Apex Bethel Energy Center

Apex Bethel Energy Center is a 317 MW cancelled battery storage site in Anderson County, Texas, operated by Apex Bethel Energy Center.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore battery storage sites in Texas

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
ABEC1Natural Gas with Compressed Air Storage159 MW Cancelled or postponed
ABEC2Natural Gas with Compressed Air Storage159 MW Cancelled or postponed

Plant details

Operator
Apex Bethel Energy Center
Location
Anderson County, Texas
Balancing authority
ERCO
Sector
IPP Non-CHP
Capacity
Cancelled: 317 MW
EIA plant ID
59048

Location

31.8878, -95.9133

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem