🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Battery storage › Texas

BATTERY STORAGE

Alamo 7 BESS 2

Alamo 7 BESS 2 is a 150 MW cancelled battery storage site in Haskell County, Texas, operated by Consolidated Edison Development Inc..

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore battery storage sites in Texas

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
A7BS2Batteries150 MW Cancelled or postponed

Plant details

Operator
Consolidated Edison Development Inc.
Location
Haskell County, Texas
Balancing authority
ERCO
Sector
IPP Non-CHP
Capacity
Cancelled: 150 MW
EIA plant ID
66298

Location

33.0066, -99.6054

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem