United States › Power plants › Battery storage › Texas
BATTERY STORAGEAlamo 7 BESS 2
Alamo 7 BESS 2 is a 150 MW cancelled battery storage site in Haskell County, Texas, operated by Consolidated Edison Development Inc..
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| A7BS2 | Batteries | 150 MW | Cancelled or postponed |
Plant details
- Operator
- Consolidated Edison Development Inc.
- Location
- Haskell County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 150 MW
- EIA plant ID
- 66298
Location
33.0066, -99.6054
Nearby power plants
- Azure Sky SolarSolar farms, Battery storage · 316 MW · 1.2 mi
- Quantum BESSBattery storage · 422 MW · 2.6 mi
- Quantum SolarSolar farms · 363 MW · 2.6 mi
- OCI Alamo 7 LLCSolar farms · 100 MW · 3.8 mi
- Quantum II BESSBattery storage · 422 MW · 9.1 mi
- Quantum II SolarSolar farms · 363 MW · 9.3 mi
- Briggs Solar, LLCSolar farms, Battery storage · 376 MW · 9.9 mi
- Inertia Energy StorageBattery storage · 13.0 MW · 12.0 mi
- Inertia Wind ProjectWind farms · 301 MW · 12.5 mi
- Millers Branch SolarSolar farms · 512 MW · 14.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem