🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Battery storage › New York

BATTERY STORAGE

Hecate Grid Intrepid

Hecate Grid Intrepid is a 300 MW cancelled battery storage site in Nassau County, New York, operated by Hecate Grid Intrepid 1 LLC.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore battery storage sites in New York

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
HGIN1Batteries250 MW Cancelled or postponed
HGIN6Batteries50 MW Cancelled or postponed

Plant details

Operator
Hecate Grid Intrepid 1 LLC
Location
Nassau County, New York
Balancing authority
NYIS
Sector
IPP Non-CHP
Capacity
Cancelled: 300 MW
EIA plant ID
66911

Location

40.6197, -73.6502

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem