United States βΊ Power plants βΊ Battery storage βΊ Texas
OCTARY USA Β· BATTERY STORAGECancelled battery storage sites in Texas
Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.
Operating263plants
Operating capacity19.3 GWnameplate
Under construction8,350 MW60 plants
Whole pipeline25.3 GWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
54 plants Β· page 1 of 2
| Plant | Capacity | Stage |
|---|---|---|
| Goldenrod Creek Solar and BESS SLF | 660 MW | Withdrawn / abandoned |
| Lunis Creek Solar and BESS SLF | 621 MW | Withdrawn / abandoned |
| Hollow Branch Creek | 460 MW | Withdrawn / abandoned |
| Dogwood Creek Solar and BESS | 443 MW | Withdrawn / abandoned |
| Brittlebush Solar and Battery Storage | 400 MW | Withdrawn / abandoned |
| Tehuacana Creek 2 Solar and BESS | 359 MW | Withdrawn / abandoned |
| Apex Bethel Energy Center | 317 MW | Withdrawn / abandoned |
| OCI SunRoper | 260 MW | Withdrawn / abandoned |
| Emerald Hill Energy Storage | 250 MW | Withdrawn / abandoned |
| Fort Watt Storage | 200 MW | Withdrawn / abandoned |
| Jerboa Storage | 200 MW | Withdrawn / abandoned |
| Malala | 200 MW | Withdrawn / abandoned |
| Wallie Storage | 200 MW | Withdrawn / abandoned |
| Augite Storage | 151 MW | Withdrawn / abandoned |
| Windmill Ridge Storage | 151 MW | Withdrawn / abandoned |
| Mcgee Storage | 151 MW | Withdrawn / abandoned |
| Alamo 7 BESS 1 | 150 MW | Withdrawn / abandoned |
| Alamo 7 BESS 2 | 150 MW | Withdrawn / abandoned |
| Crane 2 BESS 2 | 150 MW | Withdrawn / abandoned |
| Peregrine BESS 1 | 150 MW | Withdrawn / abandoned |
| Peregrine BESS 2 | 150 MW | Withdrawn / abandoned |
| Upton BESS 2 | 150 MW | Withdrawn / abandoned |
| Uvalde 2 BESS 2 | 150 MW | Withdrawn / abandoned |
| Coati Solar, LLC | 140 MW | Withdrawn / abandoned |
| Echols Grove Solar | 101 MW | Withdrawn / abandoned |
| Jim Wells BESS | 100 MW | Withdrawn / abandoned |
| Forest Grove - Dodd | 100 MW | Withdrawn / abandoned |
| Alamo 3 BESS 2 | 100 MW | Withdrawn / abandoned |
| Alamo 4 BESS | 100 MW | Withdrawn / abandoned |
| Alamo 5 BESS 1 | 100 MW | Withdrawn / abandoned |
| Alamo 5 BESS 2 | 100 MW | Withdrawn / abandoned |
| Berkman Storage | 100 MW | Withdrawn / abandoned |
| Big Elm Storage | 100 MW | Withdrawn / abandoned |
| Holly Branch Solar, LLC | 100 MW | Withdrawn / abandoned |
| Sandman Solar | 100 MW | Withdrawn / abandoned |
| TX 14 Venus Mill Storage | 100 MW | Withdrawn / abandoned |
| TX17 Nickel Prairie Storage | 100 MW | Withdrawn / abandoned |
| TX18 Cottage Meadow Storage | 100 MW | Withdrawn / abandoned |
| Cedar Range Solar | 75.7 MW | Withdrawn / abandoned |
| Trinity River Solar 1 | 75.0 MW | Withdrawn / abandoned |
| Uvalde 2 BESS 1 | 75.0 MW | Withdrawn / abandoned |
| Orange Grove | 61.0 MW | Withdrawn / abandoned |
| Oriana Solar LLC | 61.0 MW | Withdrawn / abandoned |
| Kobernat Solar and Storage | 51.5 MW | Withdrawn / abandoned |
| Lupinus Storage 3 | 50.9 MW | Withdrawn / abandoned |
| Stegall Solar and Storage | 50.5 MW | Withdrawn / abandoned |
| Peeler Solar, LLC | 50.0 MW | Withdrawn / abandoned |
| Vernon Solar and Storage | 38.0 MW | Withdrawn / abandoned |
| Hooper Solar and Storage | 30.7 MW | Withdrawn / abandoned |
| Barilla Solar | 20.0 MW | Withdrawn / abandoned |
Page 1 of 2
Next β
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Solar Proponent LLC4 plants Β· 2,084 MW
- Consolidated Edison Development Inc.10 plants Β· 1,225 MW
- Cypress Creek Renewables6 plants Β· 1,000 MW
- Belltown Power Texas 2, LLC6 plants Β· 587 MW
- Parliament Energy Holdings LLC1 plants Β· 460 MW
- 210MS 8me, LLC1 plants Β· 400 MW
- Apex Bethel Energy Center1 plants Β· 317 MW
- RWE Americas, LLC2 plants Β· 300 MW
- Key Capture Energy3 plants Β· 300 MW
- OCI Energy LLC1 plants Β· 260 MW
- Vesper Energy Development LLC1 plants Β· 250 MW
- Coati Solar, LLC1 plants Β· 140 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map