United States › Power plants › Battery storage › Texas
BATTERY STORAGEAlamo 5 BESS 2
Alamo 5 BESS 2 is a 100 MW cancelled battery storage site in Uvalde County, Texas, operated by Consolidated Edison Development Inc..
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| A5BS2 | Batteries | 100 MW | Cancelled or postponed |
Plant details
- Operator
- Consolidated Edison Development Inc.
- Location
- Uvalde County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 100 MW
- EIA plant ID
- 66296
Location
29.2200, -99.7464
Nearby power plants
- OCI Alamo 5 LLCSolar farms · 100 MW · 1.8 mi
- Uvalde Solar 2Solar farms · 300 MW · 2.9 mi
- Nightfall SolarSolar farms · 180 MW · 3.0 mi
- AP Sunray LLCSolar farms · 204 MW · 9.5 mi
- Bramble Energy CenterBattery storage · 225 MW · 18.3 mi
- SunShiner ESSBattery storage · 200 MW · 20.2 mi
- Cairos Solar and StorageSolar farms, Battery storage · 231 MW · 27.4 mi
- Anacacho Wind Farm, LLCWind farms · 99.8 MW · 27.9 mi
- Despain SolarSolar farms · 236 MW · 28.3 mi
- Regis LeakeyBattery storage · 9.9 MW · 31.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem