United States › Power plants › Solar farms › Texas
SOLAR FARMS · BATTERY STORAGEForest Grove - Dodd
Forest Grove - Dodd is a 302 MW cancelled solar and battery storage plant in Henderson County, Texas, operated by Vistra Zero LLC.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| FGPV1 | Solar Photovoltaic | 202 MW | Cancelled or postponed |
| ESS1 | Batteries | 100 MW | Cancelled or postponed |
Plant details
- Operator
- Vistra Zero LLC
- Location
- Henderson County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 302 MW
- EIA plant ID
- 64131
Location
32.2515, -95.9568
Nearby power plants
- Malakoff Solar ProjectSolar farms · 10.0 MW · 5.9 mi
- Tanzanite StorageBattery storage · 283 MW · 7.1 mi
- Pauline BESSBattery storage · 9.9 MW · 8.3 mi
- Trinidad (TX)Gas power plants, Oil-fired power plants · 243 MW · 12.2 mi
- Gaia HybridSolar farms, Battery storage · 230 MW · 15.3 mi
- Amador BESSBattery storage · 220 MW · 16.3 mi
- Fence Post Solar Hybrid Project, LLCSolar farms, Battery storage · 308 MW · 19.9 mi
- Kellam SolarSolar farms · 59.0 MW · 20.9 mi
- Bluebonnet Prairie WindWind farms · 170 MW · 21.5 mi
- Elm Flats SolarSolar farms, Battery storage · 375 MW · 22.5 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem