United States › Power plants › Battery storage › Texas
BATTERY STORAGEBerkman Storage
Berkman Storage is a 100 MW cancelled battery storage site in Galveston County, Texas, operated by Cypress Creek Renewables.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| BERK | Batteries | 100 MW | Cancelled or postponed |
Plant details
- Operator
- Cypress Creek Renewables
- Location
- Galveston County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 100 MW
- EIA plant ID
- 67651
Location
29.5007, -95.0820
Nearby power plants
- Wizard Energy StorageBattery storage · 150 MW · 0.2 mi
- WAL5388Gas power plants · 1.3 MW · 2.2 mi
- HEB00028Gas power plants · 1.2 MW · 2.5 mi
- Hidden Lakes Reliability ProjectBattery storage · 220 MW · 2.9 mi
- DickinsonBattery storage · 9.9 MW · 3.1 mi
- Magnolia TXBattery storage · 9.9 MW · 3.2 mi
- NASA Johnson Space Center CHPGas power plants · 11.2 MW · 4.3 mi
- WAL3298Gas power plants · 1.2 MW · 4.5 mi
- HEB00769Gas power plants · 1.2 MW · 5.5 mi
- WAL1062Gas power plants · 1.2 MW · 5.8 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem