United States βΊ Power plants βΊ Battery storage
OCTARY USA Β· BATTERY STORAGECypress Creek Renewables: battery storage sites in the USA
Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.
Operating3plants
Operating capacity340 MWnameplate
Under construction800 MW4 plants
Whole pipeline1,496 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
13 plants
| Plant | Capacity | Stage |
|---|---|---|
| Vitex Storage | 300 MW | In planning |
| Steel River Solar Phase 1 | 250 MW | Under construction |
| Steel River Solar Phase 2 | 250 MW | Under construction |
| Steel River Solar Phase 3 | 250 MW | Under construction |
| Bhalu | 200 MW | In planning |
| Destiny Storage | 200 MW 400 MWh |
|
| Brazos Bend BESS, LLC | 100 MW 100 MWh |
|
| Third Coast BESS, LLC | 100 MW | Consented |
| Sundance (CO) | 50.0 MW | Under construction |
| Zier Solar | 40.4 MW 80 MWh |
|
| Black Walnut Solar, LLC | 32.0 MW | In planning |
| Panther Branch Solar, LLC | 32.0 MW | In planning |
| Timber Mill Solar | 32.0 MW | In planning |
Operating capacity by state
Click a state to drill down.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- IPX Power USA, LLC12 plants Β· 2,807 MW
- Vesper Energy Development LLC13 plants Β· 2,740 MW
- Engie North America31 plants Β· 2,663 MW
- Clenera DevCo LLC7 plants Β· 1,947 MW
- Cypress Creek Renewables13 plants Β· 1,836 MW
- RWE Americas, LLC21 plants Β· 1,452 MW
- AES Clean Energy16 plants Β· 1,416 MW
- RIC Development, LLC8 plants Β· 1,351 MW
- Belltown Power Texas 2, LLC8 plants Β· 1,207 MW
- Sunstone Solar, LLC1 plants Β· 1,200 MW
- BrightNight Power4 plants Β· 1,117 MW
- Parliament Energy Holdings LLC3 plants Β· 1,071 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map