πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Battery storage

OCTARY USA Β· BATTERY STORAGE

Vesper Energy Development LLC: battery storage sites in the USA

Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.

Operating0plants
Operating capacity0.0 MWnameplate
Under construction0.0 MW0 plants
Whole pipeline2,740 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

13 plants
PlantCapacityStageStateOwner / operatorYear
Sunscape Renewable Energy 500 MW In planning TX
Nueces
Vesper Energy Development LLC 2028
Red Hollow Renewable Energy 300 MW In planning TX
Archer
Vesper Energy Development LLC 2027
Sunrose Renewable Energy 300 MW In planning TX
Austin
Vesper Energy Development LLC 2027
Athens Solar I (Hybrid) 250 MW In planning CA
Placer
Vesper Energy Development LLC 2028
Mystic Springs Renewable Energy (Hybrid) 250 MW In planning TX
Kaufman
Vesper Energy Development LLC 2028
Hornet Solar II (TX) (Hybrid) 200 MW In planning TX
Swisher
Vesper Energy Development LLC 2028
Juniper Creek Storage 200 MW Consented CA
Sacramento
Vesper Energy Development LLC 2028
Scopus Solar 200 MW In planning MO
Bollinger
Vesper Energy Development LLC 2027
Vichy Solar 200 MW In planning MO
Maries
Vesper Energy Development LLC 2027
Meadow Springs Renewable Energy (Hybrid) 150 MW In planning IL
White
Vesper Energy Development LLC 2028
Skylight Renewable Energy 100 MW In planning CA
Sutter
Vesper Energy Development LLC 2028
Aurora Renewable Energy (Hybrid) 50.0 MW In planning CA
Stanislaus
Vesper Energy Development LLC 2028
Syracuse and Tours Renewable Energy 40.0 MW Consented CA
Kern
Vesper Energy Development LLC 2027

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map