United States › Power plants › Battery storage › California
BATTERY STORAGE · SOLAR FARMSAurora Renewable Energy (Hybrid)
Aurora Renewable Energy (Hybrid) is a 100 MW planned power plant in Stanislaus County, California, operated by Vesper Energy Development LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Apr 2028 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Apr 2028.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| AURRB | Batteries | 50 MW | Planned, approvals not yet sought |
| AURRE | Solar Photovoltaic | 50 MW | Planned, approvals not yet sought |
Plant details
- Operator
- Vesper Energy Development LLC
- Location
- Stanislaus County, California
- Balancing authority
- BANC
- Sector
- IPP Non-CHP
- Capacity
- Planned: 100 MW
- EIA plant ID
- 67983
Location
37.6288, -121.0714
Nearby power plants
- WoodlandGas power plants · 199 MW · 3.2 mi
- Almond Power PlantGas power plants · 224 MW · 6.0 mi
- Ripon Generation StationGas power plants · 121 MW · 7.5 mi
- AltaGas Ripon Energy Inc.Gas power plants · 49.5 MW · 7.6 mi
- McClureGas power plants, Oil-fired power plants · 142 MW · 7.7 mi
- ERock MID Claribel Generation StationGas power plants · 48.0 MW · 8.0 mi
- Axium Modesto SolarSolar farms · 25.0 MW · 8.4 mi
- Noosa Energy Storage LLCBattery storage · 99.0 MW · 9.8 mi
- Tesoro RV & Boat StorageSolar farms · 2.5 MW · 12.0 mi
- Amazon - Patterson PVSolar farms · 2.5 MW · 12.2 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem