United States › Power plants › Battery storage › California
BATTERY STORAGENoosa Energy Storage LLC
Noosa Energy Storage LLC is a 99.0 MW under construction battery storage site in San Joaquin County, California, operated by Engie North America.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2026.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| KOV4A | Batteries | 99 MW | Under construction (up to 50%) |
Plant details
- Operator
- Engie North America
- Location
- San Joaquin County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 99.0 MW
- EIA plant ID
- 64531
Location
37.7563, -121.1481
Nearby power plants
- AltaGas Ripon Energy Inc.Gas power plants · 49.5 MW · 2.4 mi
- Ripon Generation StationGas power plants · 121 MW · 2.5 mi
- Tesoro RV & Boat StorageSolar farms · 2.5 MW · 2.5 mi
- CA Manteca 730 Spreckels AveSolar farms, Battery storage · 3.0 MW · 3.4 mi
- Manteca Land PVSolar farms · 1.0 MW · 6.9 mi
- Lathrop 4 - SLCVA204Solar farms, Battery storage · 3.4 MW · 8.2 mi
- Axium Modesto SolarSolar farms · 25.0 MW · 8.5 mi
- Ameresco ForwardBioenergy plants · 4.4 MW · 9.0 mi
- Aurora Renewable Energy (Hybrid)Solar farms, Battery storage · 100 MW · 9.8 mi
- WoodlandGas power plants · 199 MW · 10.0 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem