πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Battery storage

OCTARY USA Β· BATTERY STORAGE

Engie North America: battery storage sites in the USA

Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.

Operating27plants
Operating capacity1,989 MWnameplate
Under construction674 MW4 plants
Whole pipeline674 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

31 plants
PlantCapacityStageStateOwner / operatorYear
Zeya 250 MW Under construction TX
Galveston
Engie North America 2026
Cachi 200 MW
400 MWh
Operating TX
Guadalupe
Engie North America 2025
Castor 200 MW Under construction TX
Brazoria
Engie North America 2026
Desna 200 MW
400 MWh
Operating TX
Brazoria
Engie North America 2026
Dickens 200 MW
200 MWh
Operating TX
Dickens
Engie North America 2024
Hydra 200 MW
200 MWh
Operating TX
Pecos
Engie North America 2024
Paleo 200 MW
200 MWh
Operating TX
Hale
Engie North America 2024
Pavo 175 MW
175 MWh
Operating TX
Pecos
Engie North America 2024
Avila 160 MW
320 MWh
Operating TX
Pecos
Engie North America 2025
Carina 150 MW
300 MWh
Operating TX
Nueces
Engie North America 2025
Octans 125 MW Under construction TX
Pecos
Engie North America 2028
Bat Cave 100 MW
110 MWh
Operating TX
Mason
Engie North America 2021
North Fork TX 100 MW
110 MWh
Operating TX
Williamson
Engie North America 2021
Noosa Energy Storage LLC 99.0 MW Under construction CA
San Joaquin
Engie North America 2026
Antlia 70.0 MW
140 MWh
Operating TX
Val Verde
Engie North America 2025
Tortolas 50.0 MW
50 MWh
Operating TX
Brazoria
Engie North America 2024
Cascade Energy Storage, LLC 25.0 MW
100 MWh
Operating CA
San Joaquin
Engie North America 2024
Pueblo BA 19.8 MW
20 MWh
Operating TX
Maverick
Engie North America 2022
Zapata 19.8 MW
20 MWh
Operating TX
Zapata
Engie North America 2022
Sierra Energy Storage, LLC 10.0 MW
40 MWh
Operating CA
Tuolumne
Engie North America 2025
Alvin 9.9 MW
10 MWh
Operating TX
Brazoria
Engie North America 2020
Angleton 9.9 MW
10 MWh
Operating TX
Brazoria
Engie North America 2020
Brazoria 9.9 MW
10 MWh
Operating TX
Brazoria
Engie North America 2020
Dickinson 9.9 MW
10 MWh
Operating TX
Galveston
Engie North America 2021
Heights 9.9 MW
10 MWh
Operating TX
Galveston
Engie North America 2020
Loop 463 9.9 MW
10 MWh
Operating TX
Victoria
Engie North America 2021
Lopeno 9.9 MW
10 MWh
Operating TX
Zapata
Engie North America 2022
Magnolia TX 9.9 MW
10 MWh
Operating TX
Galveston
Engie North America 2020
Odessa 9.9 MW
10 MWh
Operating TX
Ector
Engie North America 2020
Ranchtown 9.9 MW
10 MWh
Operating TX
Bexar
Engie North America 2021
Sweeny 9.9 MW
10 MWh
Operating TX
Brazoria
Engie North America 2021

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map