United States › Power plants › Solar farms › Texas
SOLAR FARMS · BATTERY STORAGERed Hollow Renewable Energy
Red Hollow Renewable Energy is a 600 MW planned solar and battery storage plant in Archer County, Texas, operated by Vesper Energy Development LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Oct 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Oct 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| RDHLW | Solar Photovoltaic | 300 MW | Planned, approvals not yet sought |
| RHLWB | Batteries | 300 MW | Planned, approvals not yet sought |
Plant details
- Operator
- Vesper Energy Development LLC
- Location
- Archer County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 600 MW
- EIA plant ID
- 68030
Location
33.5649, -98.6120
Nearby power plants
- Bobcat Bluff Wind Project LLCWind farms · 161 MW · 5.3 mi
- Windthorst-2Wind farms · 67.6 MW · 8.0 mi
- Trinity HillsWind farms · 198 MW · 13.8 mi
- OlneyOil-fired power plants, Battery storage · 19.8 MW · 14.8 mi
- 1370 ShannonWind farms · 204 MW · 15.0 mi
- Signal Hill Generating LLCGas power plants · 80.0 MW · 20.6 mi
- WAL414Gas power plants · 1.2 MW · 21.2 mi
- Diversion Wind Energy LLCWind farms · 201 MW · 25.9 mi
- Senate Wind LLCWind farms · 150 MW · 28.6 mi
- GrahamGas power plants · 635 MW · 29.7 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem