🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Solar farms › Texas

SOLAR FARMS · BATTERY STORAGE

Peeler Solar, LLC

Peeler Solar, LLC is a 250 MW cancelled solar and battery storage plant in Atascosa County, Texas, operated by Peeler Solar, LLC.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore solar farms in Texas

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
PEELRSolar Photovoltaic200 MW Cancelled or postponed
PEEL2Batteries50 MW Cancelled or postponed

Plant details

Operator
Peeler Solar, LLC
Location
Atascosa County, Texas
Balancing authority
ERCO
Sector
IPP Non-CHP
Capacity
Cancelled: 250 MW
EIA plant ID
65932

Location

28.7017, -98.4434

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem