United States › Power plants › Battery storage › Texas
BATTERY STORAGEAlamo 3 BESS 2
Alamo 3 BESS 2 is a 100 MW cancelled battery storage site in Bexar County, Texas, operated by Consolidated Edison Development Inc..
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| A3BS2 | Batteries | 100 MW | Cancelled or postponed |
Plant details
- Operator
- Consolidated Edison Development Inc.
- Location
- Bexar County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 100 MW
- EIA plant ID
- 66293
Location
29.4201, -98.5721
Nearby power plants
- Commerce ESSBattery storage · 10.0 MW · 2.9 mi
- Commerce SolarSolar farms · 5.0 MW · 2.9 mi
- Leon CreekGas power plants · 230 MW · 4.7 mi
- Ferdinand Energy CenterBattery storage · 200 MW · 5.0 mi
- HEB_CPS00085Gas power plants · 1.6 MW · 8.0 mi
- Nelson Gardens Landfill Gas to EnergyBioenergy plants · 4.4 MW · 8.2 mi
- Bexar ESSBattery storage · 100 MW · 12.4 mi
- HEB_CPSSADCGas power plants · 6.4 MW · 12.7 mi
- OCI Alamo Solar I HybridSolar farms · 40.7 MW · 12.8 mi
- El PatrimonioSolar farms · 150 MW · 13.0 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem