🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Battery storage

OCTARY USA · BATTERY STORAGE

Battery storage sites in the USA — page 18

Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.

Operating1,086plants
Operating capacity56.1 GWnameplate
Under construction23.3 GW230 plants
Whole pipeline64.2 GWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

1,552 plants · page 18 of 32
PlantCapacityStageStateOwner / operatorYear
Spencer Clean Energy Center (BESS) 12.0 MW
21 MWh
Operating TX
Harris
On Energy Storage 2025
Winmil Clean Energy Center (BESS) 12.0 MW
21 MWh
Operating TX
Brazoria
On Energy Storage 2025
Bromley Battery Storage 11.8 MW
47 MWh
Operating CO
Adams
Bromley Energy Storage LLC 2024
Davis Battery Storage 11.8 MW
47 MWh
Operating CO
Weld
Davis UP Energy Storage LLC 2024
Keenesburg Battery Storage 11.8 MW
47 MWh
Operating CO
Weld
Keenesburg Energy Storage LLC 2024
Rattlesnake Ridge Battery Storage 11.8 MW
47 MWh
Operating CO
Weld
Rattlesnake Ridge Energy Storage LLC 2024
Parkwood BESS 11.6 MW Under construction NC
Union
North Carolina El Member Corp 2026
Calistoga Resilency Center 11.3 MW
12 MWh
Operating CA
Napa
Calistoga Resiliency Center, LLC 2025
High Mesa CO 11.2 MW
20 MWh
Operating CO
Garfield
AES Clean Energy 2025
Mamm Creek 11.2 MW
20 MWh
Operating CO
Garfield
AES Clean Energy 2025
Auwahi Wind Energy Hybrid 11.0 MW
4 MWh
Operating HI
Maui
Auwahi Wind Energy LLC 2012
Danville VA BESS 2 11.0 MW Under construction VA
Pittsylvania
Danville VA BESS 2 LLC 2026
Denali Energy Storage 11.0 MW Under construction TX
Austin
Denali Energy Storage LLC 2027
Edwards Sanborn E3 11.0 MW
32 MWh
Operating CA
Kern
Terra-Gen Operating Co-Hybrid 2021
Mount Whitney BESS 11.0 MW Under construction TX
Waller
Mount Whitney BESS LLC 2027
Silverstrand Grid Energy Storage System 11.0 MW
44 MWh
Operating CA
Ventura
Silverstrand Grid, LLC 2021
Trenton 11.0 MW
10 MWh
Operating FL
Gilchrist
Duke Energy Florida, LLC 2021
Warsaw 2 Energy Storage 11.0 MW
20 MWh
Operating NC
Duplin
Duke Energy Progress - (NC) 2026
Danville BESS 1 10.5 MW
25 MWh
Operating VA
Danville City
Doc Brown LLC 2022
Green Mountain Storage, LLC 10.4 MW
10 MWh
Operating PA
Somerset
Green Mountain Storage, LLC 2016
Toyah Power Station 10.4 MW
10 MWh
Operating TX
Reeves
HEN Infrastructure, L.L.C. 2021
Alamo Clean Energy Center (BESS) 10.1 MW
20 MWh
Operating TX
Pecos
On Energy Storage 2026
Colorado Clean Energy Center (BESS) 10.1 MW Under construction TX
Colorado
On Energy Storage 2026
Columbus Clean Energy Center (BESS) 10.1 MW Under construction TX
Colorado
On Energy Storage 2026
Fort Stockton Clean Energy Center (BESS) 10.1 MW
20 MWh
Operating TX
Pecos
On Energy Storage 2026
Martinsville BESS 10.1 MW
10 MWh
Operating VA
Henry
Onsite Partners, LLC 2022
Matagorda Clean Energy Center (BESS) 10.1 MW Under construction TX
Matagorda
On Energy Storage 2026
Mesquite Clean Energy Center (BESS) 10.1 MW
20 MWh
Operating TX
Cameron
On Energy Storage 2026
North Pecos Clean Energy Center (BESS) 10.1 MW
20 MWh
Operating TX
Reeves
On Energy Storage 2026
Shelby BESS 10.1 MW
10 MWh
Operating OH
Richland
Onsite Partners, LLC 2025
Aggreko MSR Grid PC2 10.0 MW
19 MWh
Operating TX
Nueces
DGI Rattler LLC 2026
Aggreko MSR Grid PC5 10.0 MW
19 MWh
Operating TX
Cameron
DGI Rattler LLC 2026
Aggreko MSR Grid PC7 10.0 MW
19 MWh
Operating TX
Cameron
DGI Rattler LLC 2026
Allatoona Substation #10 10.0 MW
40 MWh
Operating GA
Cobb
Cobb Electric Membership Corporation 2026
Alpaugh BESS 10.0 MW
10 MWh
Operating CA
Tulare
RWE Americas, LLC 2026
Archie Horne 10.0 MW
20 MWh
Operating NC
Onslow
North Carolina El Member Corp 2024
Babcock Solar Energy Center Hybrid 10.0 MW
40 MWh
Operating FL
Charlotte
Florida Power & Light Co 2018
BCE Los Alamitos 1 10.0 MW
20 MWh
Operating CA
Orange
Bright Canyon Energy 2023
BCE Los Alamitos 2 10.0 MW
20 MWh
Operating CA
Orange
Bright Canyon Energy 2023
BESS La Feria 10.0 MW
25 MWh
Operating TX
Cameron
Grenergy USA LLC 2026
BESS Stadium 10.0 MW
25 MWh
Operating TX
Jim Wells
Grenergy USA LLC 2026
BESS TX Panda - BSHOU004 10.0 MW
10 MWh
Operating TX
Harris
Prologis Logistics Services Incorporated BESS 2025
BESS TX Top Gear - BSHOU002 10.0 MW
25 MWh
Operating TX
Harris
Prologis Logistics Services Incorporated BESS 2025
Boulevard Energy Storage 10.0 MW
10 MWh
Operating CA
San Diego
San Diego Gas & Electric Co 2024
Butler 10.0 MW
20 MWh
Operating NC
Cumberland
North Carolina El Member Corp 2024
Carris Storage I 10.0 MW
20 MWh
Operating CA
Riverside
Hecate Grid Carris Storage 1 LLC 2025
Cedar Hill ESS 10.0 MW In planning TX
Dallas
Cedar Hill ESS Assets, LLC 2030
Center Hybrid 10.0 MW
10 MWh
Operating CA
Los Angeles
Southern California Edison Co 2016
Century BESS 10.0 MW
25 MWh
Operating TX
Tarrant
Prologis Logistics Services Incorporated BESS 2024
Chukar Battery Energy Storage System 10.0 MW
40 MWh
Operating NV
Storey
Nevada Power Co 2021
Page 18 of 32

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map