πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Battery storage

OCTARY USA Β· BATTERY STORAGE

Florida Power & Light Co: battery storage sites in the USA

Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.

Operating13plants
Operating capacity1,015 MWnameplate
Under construction0.0 MW0 plants
Whole pipeline0.0 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

13 plants
PlantCapacityStageStateOwner / operatorYear
Manatee Solar Energy Center 409 MW
900 MWh
Operating FL
Manatee
Florida Power & Light Co 2021
Blackwater River Solar Energy Center 74.5 MW
224 MWh
Operating FL
Santa Rosa
Florida Power & Light Co 2025
Canoe 74.5 MW
224 MWh
Operating FL
Okaloosa
Florida Power & Light Co 2025
Fourmile Creek 74.5 MW
224 MWh
Operating FL
Calhoun
Florida Power & Light Co 2025
FPL Chipola River Solar Energy Center 74.5 MW
224 MWh
Operating FL
Calhoun
Florida Power & Light Co 2025
FPL Shirer Branch Solar Energy Center 74.5 MW
224 MWh
Operating FL
Calhoun
Florida Power & Light Co 2025
Kayak 74.5 MW
224 MWh
Operating FL
Okaloosa
Florida Power & Light Co 2025
Tenmile Creek 74.5 MW
224 MWh
Operating FL
Calhoun
Florida Power & Light Co 2025
Echo River Solar 30.0 MW
75 MWh
Operating FL
Suwannee
Florida Power & Light Co 2021
Sunshine Gateway Solar Energy Center 30.0 MW
75 MWh
Operating FL
Columbia
Florida Power & Light Co 2021
Babcock Solar Energy Center Hybrid 10.0 MW
40 MWh
Operating FL
Charlotte
Florida Power & Light Co 2018
Wynwood Energy Storage 10.0 MW
40 MWh
Operating FL
Miami Dade
Florida Power & Light Co 2019
Citrus Solar Energy Center Hybrid 4.0 MW
16 MWh
Operating FL
DeSoto
Florida Power & Light Co 2018

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map