🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Solar farms › California

SOLAR FARMS · BATTERY STORAGE

BCE Los Alamitos 1

BCE Los Alamitos 1 is a 20.0 MW operating solar and battery storage plant in Orange County, California, operated by Bright Canyon Energy. Its batteries store up to 20 MWh.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingAug 2023 (current stage)
  5. Closed (not yet reached)

Open in Google MapsMore solar farms in California

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
BCE11Solar Photovoltaic10 MW OperatingAug 2023
BCE12Batteries10 MW
20 MWh
OperatingAug 2023

Plant details

Operator
Bright Canyon Energy
Location
Orange County, California
Balancing authority
CISO
Sector
IPP Non-CHP
Capacity
Operating: 20.0 MW
First unit online
Aug 2023
EIA plant ID
66533

Location

33.7899, -118.0639

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem