United States › Power plants › Solar farms › California
SOLAR FARMS · BATTERY STORAGEBCE Los Alamitos 1
BCE Los Alamitos 1 is a 20.0 MW operating solar and battery storage plant in Orange County, California, operated by Bright Canyon Energy. Its batteries store up to 20 MWh.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| BCE11 | Solar Photovoltaic | 10 MW | |
| BCE12 | Batteries | 10 MW 20 MWh |
Plant details
- Operator
- Bright Canyon Energy
- Location
- Orange County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 20.0 MW
- First unit online
- Aug 2023
- EIA plant ID
- 66533
Location
33.7899, -118.0639
Nearby power plants
- BCE Los Alamitos 2Solar farms, Battery storage · 20.0 MW · 0.8 mi
- AES ES Alamitos, LLCBattery storage · 100 MW · 2.5 mi
- AES ES Alamitos 2 LLCBattery storage · 82.0 MW · 2.5 mi
- CSU Long BeachBattery storage · 2.5 MW · 2.6 mi
- AES Alamitos LLCGas power plants · 1,115 MW · 2.6 mi
- AES Alamitos Energy CenterGas power plants · 678 MW · 2.6 mi
- HaynesGas power plants · 1,739 MW · 2.7 mi
- CSU Long Beach Lots 7 & 14Solar farms · 4.5 MW · 2.9 mi
- Westminster Reliability Project, LLCBattery storage · 110 MW · 3.2 mi
- BCE Seal BeachSolar farms, Battery storage · 28.7 MW · 4.1 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem