United States › Power plants › Gas power plants › California
GAS POWER PLANTSHaynes
Haynes is a 1,739 MW operating gas power plant in Los Angeles County, California, operated by Los Angeles Department of Water & Power.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 8 | Natural Gas Fired Combined Cycle | 264 MW | |
| 1 | Natural Gas Steam Turbine | 230 MW | |
| 2 | Natural Gas Steam Turbine | 230 MW | |
| 9 | Natural Gas Fired Combined Cycle | 183 MW | |
| 10 | Natural Gas Fired Combined Cycle | 183 MW | |
| 11 | Natural Gas Fired Combustion Turbine | 108 MW | |
| 12 | Natural Gas Fired Combustion Turbine | 108 MW | |
| 13 | Natural Gas Fired Combustion Turbine | 108 MW | |
| 14 | Natural Gas Fired Combustion Turbine | 108 MW | |
| 15 | Natural Gas Fired Combustion Turbine | 108 MW | |
| 16 | Natural Gas Fired Combustion Turbine | 108 MW | |
| 5 | Natural Gas Steam Turbine | 343 MW | Retired |
| 6 | Natural Gas Steam Turbine | 343 MW | Retired |
| 3 | Natural Gas Steam Turbine | 230 MW | Retired |
| 4 | Natural Gas Steam Turbine | 230 MW | Retired |
Plant details
- Operator
- Los Angeles Department of Water & Power
- Location
- Los Angeles County, California
- Balancing authority
- LDWP
- Sector
- Electric Utility
- Capacity
- Operating: 1,739 MW
Retired: 1,146 MW - First unit online
- Sep 1962
- EIA plant ID
- 400
Location
33.7647, -118.0991
Nearby power plants
- AES Alamitos Energy CenterGas power plants · 678 MW · 0.2 mi
- AES Alamitos LLCGas power plants · 1,115 MW · 0.3 mi
- AES ES Alamitos, LLCBattery storage · 100 MW · 0.4 mi
- AES ES Alamitos 2 LLCBattery storage · 82.0 MW · 0.4 mi
- CSU Long Beach Lots 7 & 14Solar farms · 4.5 MW · 1.4 mi
- CSU Long BeachBattery storage · 2.5 MW · 1.4 mi
- BCE Los Alamitos 1Solar farms, Battery storage · 20.0 MW · 2.7 mi
- BCE Los Alamitos 2Solar farms, Battery storage · 20.0 MW · 3.1 mi
- BCE Seal BeachSolar farms, Battery storage · 28.7 MW · 3.8 mi
- City of Long Beach Airport Lot A & BSolar farms · 1.8 MW · 4.2 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem