United States › Power plants › Battery storage › Texas
BATTERY STORAGEAggreko MSR Grid PC7
Aggreko MSR Grid PC7 is a 10.0 MW operating battery storage site in Cameron County, Texas, operated by DGI Rattler LLC. Its batteries store up to 19 MWh.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| PC7 | Batteries | 10 MW 19 MWh |
Plant details
- Operator
- DGI Rattler LLC
- Location
- Cameron County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 10.0 MW
- First unit online
- Apr 2026
- EIA plant ID
- 69418
Location
26.0014, -97.5218
Nearby power plants
- WAL456Gas power plants · 1.2 MW · 1.8 mi
- Hecate Grid East Valley StorageBattery storage · 255 MW · 4.2 mi
- Villa CavasosOil-fired power plants · 9.0 MW · 4.8 mi
- SMT Los Fresnos LLCBattery storage · 10.0 MW · 5.1 mi
- Silas RayGas power plants, Oil-fired power plants · 143 MW · 6.1 mi
- Regis LaurelesBattery storage · 9.9 MW · 8.5 mi
- Resaca Oasis StorageBattery storage · 201 MW · 9.4 mi
- San Roman Wind I, LLCWind farms · 95.3 MW · 12.4 mi
- Cameron Wind 1 LLCBattery storage, Wind farms · 181 MW · 13.8 mi
- VaqueroOil-fired power plants · 9.0 MW · 14.1 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem